Laserfiche WebLink
Kimley»>Horn <br />Community Questions and Comments <br />1. Verbal Question: Will a traffic control device be included in the site plans to prevent <br />trucks from passing through the new building and the neighbor building? Will there be <br />an access point for the water drainage to run off into the Garry Avenue and not drain <br />into the neighboring property? <br />Verbal Response: Applicant responded that this project is still working on some of <br />the conditions of the project for approval but will make sure that this is included in the <br />discussion and will be considered as part of the review process. <br />2. Verbal Question: Why is the screening wall eight feet tall, where is it, and does it have <br />wire on the top? <br />Verbal Response: There will be a ten -foot decorative concrete wall facing north east <br />of the project site. The wall is meant to screen the trucks. The rendering in the <br />PowerPoint included a rendering of a potential future overpass. <br />3. Verbal Question: Are there buildings as a part of the project? How many employees <br />are you expecting to have? <br />Verbal Response: Yes, there will be a building, the docks have been changed so that <br />they do not face the surrounding properties. The number of employees is currently <br />unknown since there is no tenant right now but will be similar to an industrial type of <br />property. From a traffic standpoint, it will be a less intensive use than what is there <br />now. <br />4. Verbal Question: Concerned about the trucks clogging up the surrounding streets. Is <br />there any way that you can restrict trucks between 4:00pm-6:00pm so that trucks are <br />not getting in the way of current residents getting home? <br />Response: There was an intensive traffic study done to be able to show the influx of <br />trucks for this type of use might be coming and going and it did not show any intensive <br />additional traffic than what was already there. If it does look like this will be an issue <br />with a future tenant, we can sit down and see what can be done. Applicant willing to <br />share the traffic studies. <br />5. Verbal Question: Are there limitations as to how many trucks or the size of trucks? <br />Verbal Response: There is a capacity issue that the building can be able to hold. This <br />isn't an Amazon site where there are vans and multiple trips coming in and out of the <br />site. We do not have a tenant so there are no set hours of operation. <br />