My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Architectural Design Services for Santa Anita Community Center
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/06/2022 Regular
>
Item 19 - Architectural Design Services for Santa Anita Community Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 3:07:25 PM
Creation date
8/11/2023 4:45:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
12/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Door/Window/Finish Schedules, as applicable <br />ADA Path of Travel design and/or signage Plan <br />• Structural Engineering <br />Structural Design and Detailing <br />• Mechanical Engineering & Plumbing <br />• Electrical Engineering <br />Electrical Site Plan to include walkway/parking lot <br />lighting, irrigation. <br />Photometrics. <br />Location of panels, switchgear, meters <br />Schedules <br />Details <br />Notes, specifications <br />9 <br />Plan Check & Permits: Construction drawings shall be in <br />accordance with the 2019 California Building Code and will <br />require review/approval by the City Planning and Building <br />Agency. Additionally, this would be subject to review by the <br />Historic Resources Commission. <br />TASK 5: BID ADVERTISEMENT, CONSTRUCTION <br />ADMINISTRATION, RECORD DRAWINGS: <br />• Bid Advertisement: Consultant shall provide support to the <br />City during the Bidding phase by assisting with questions, <br />requests for information/clarification, or conflicts arising out <br />of the bidding process. Consultant shall also attend pre -bid <br />meeting, if scheduled. <br />• Construction Administration: Consultant shall provide <br />support to the City during the Construction Administration <br />phase by assisting with questions, requests for information/ <br />clarification, and/or reviewing submittals. <br />• Record Drawings /As -built Plans: Upon construction <br />completion, consultant shall incorporate as -built information, <br />as provided by the General Contractor, into the drawing files <br />to provide record drawings for City archives. <br />CITY OF SANTA ANA: NEW COMMUNITY CENTER 1 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.