Laserfiche WebLink
Additional questions (per the Chat option): <br />1. Hi. Thank you all for arranging this meeting. I have already reached out to the email, <br />but did not ask about being put on the interest list. Will I have to do that? <br />a. RESPONSE: Everyone that has emailed the project email, has been put on the <br />interest list. <br />2. Right, but there is additional density available to the project if you also add in moderate <br />for -sale units. <br />a. RESPONSE: We already addressed this in an earlier question. Warmington is <br />following the California Density Bonus Law and City regulations and has selected <br />the low income designation. <br />3. How many bedrooms or bathrooms will be in each unit? Particularly in the affordable <br />units? <br />a. RESPONSE: There will be affordable units in each of the four plan types. The <br />plan types will range between 1,208 SF (2 bedroom/2.5 bathrooms) to 1,845 SF <br />(3 bedrooms plus a den, optional 4th bedroom, with 3.5 bathrooms). And, the <br />project has been working with the City's Housing Dept. regarding the distribution <br />of the affordable units. The City has indicated the distribution and the project is <br />following that. <br />4. Approximately how much will homes be sold for? <br />a. RESPONSE: We do not have information at this time regarding pricing. Within <br />10-12 months, that information should be ready to share with the public (when <br />the marketing is anticipated to start). <br />5. One recommendation. Maybe think about creating more parking spaces and renting <br />them out. Two spaces per unit will be difficult. Even if you rent them out, it will be a <br />good investment idea. <br />a. RESPONSE: These are for -sale townhomes, not rental units, so each buyer will <br />own its garage spaces. We appreciate the comment and have followed the <br />regulations. <br />The Q&A portion of the presentation ended at approximately 7pm. The meeting concluded <br />with the Applicant thanking the attendees for their time in attending this 2nd community <br />meeting and indicating that any additional questions can be directed to the project email <br />provided, as well as the numbers provided. <br />Page 7 of 7 <br />