Laserfiche WebLink
SHEET INDEX <br />SHEET INDEX <br />SHEET INDEX <br />AD-61.2 CONCRETE FLAT TILE ROOF DETAILS <br />A2-63 Building B Courtyard Elevations <br />ARCHITECTURAL <br />4TH <br />AND <br />MORTIMER <br />AD-71 INTERIOR STAIR DETAILS (STEEL STRINGER & PRE -CAST) <br />A2-70 <br />Building B Sections <br />Number <br />Description <br />AD-71.1 INTERIOR STAIR DETAILS (WOOD) <br />A2-71 <br />Building B Sections <br />AO-01 <br />TITLE SHEET <br />AD-81 STOREFRONT DETAILS (Flush Conditions) <br />A2-80 <br />Building B Wall Sections <br />AO-02 <br />SHEET INDEX <br />AD-82 STOREFRONT DETAILS (Recessed Conditions) <br />A2-81 <br />Building B Wall Sections <br />AO-02 <br />Code & Project Summaries <br />A5-01 <br />Unit 0.1 Plans and Interior Elevations <br />AO-03A <br />Building A Allowable Area Calculations <br />415&515E.4TH <br />STREET <br />SANTAANA CA92701 <br />A5-02 <br />A5-03 <br />Unit 0.2 Plans and Interior Elevations <br />Unit 0.3 Plans and Interior Elevations <br />AO-03B <br />AO-04 <br />Building B Allowable Area Calculations <br />Building and Unit Summary <br />A5-11 <br />Unit 1.1 Plans and Interior Elevations <br />AO-11 <br />Building A First Floor Fire Protection Plans <br />A5-12 <br />Unit 1.1 Plan Variations <br />AO-12 <br />Building A Second Floor Fire Protection Plans <br />PERMIT <br />NUMBER <br />A5-13 <br />A5-21 <br />Unit 1.2 Plans and Interior Elevations <br />Unit 2.1 Plans and Interior Elevations <br />AO-13 <br />AO-14 <br />Building A Third Floor Fire Protection Plans <br />Building A Fourth Floor Fire Protection Plans <br />A5-22 <br />Unit 2.1 Plans and Variations <br />AO-15 <br />Building A Fifth Floor Fire Protection Plans <br />A5-23 <br />Unit 2.1 Plan Variations <br />AO-16 <br />Building A Sixth Floor Fire Protection Plans <br />A5-24 <br />Unit 2.1 Plan Variations <br />AO-17 <br />Building A Seventh Floor Fire Protection Plans <br />A5-25 <br />Unit 2.2 Plans and Interior Elevations <br />AO-21 <br />Building B First Floor Fire Protection Plan <br />A5-26 <br />Unit 2.2 Plan Variations <br />AO-22 <br />Building B Second Floor Fire Protection Plan <br />A5-27 <br />Unit 2.2 Plan Variations <br />AO-23 <br />Building B Third Floor Fire Protection Plan <br />A5-28 <br />Unit 2.2 Plan Variations <br />AO-24 <br />Building B Fourth Floor Fire Protection Plan <br />A5-29 <br />Unit 2.2 Plan Variation <br />AO-25 <br />Building B Fifth Floor Fire Protection Plan <br />A5-30 <br />Unit 2.3 Plans and Interior Elevations <br />AO-31 <br />Building A First Floor Exiting Analysis <br />A5-31 <br />Unit 2.3 Plan Variations <br />AO-32 <br />Building A Second Floor Exiting Analysis <br />A5-32 <br />A5-33 <br />Unit 2.4 Plans and Interior Elevations <br />Unit 2.4 Plan Variation <br />AO-33 <br />AO-34 <br />Building A Third Floor Exiting Analysis <br />Building A Fourth Floor Exiting Analysis <br />A5-34 <br />Unit 2.5 Plans, Variation and Interior Elevations <br />AO-35 <br />Building A Fifth Floor Exiting Analysis <br />A5-35 <br />Unit 2.6 Plans and Interior Elevations <br />AO-36 <br />Building A Sixth Floor Exiting Analysis <br />ABBREVIATIONSPROJECT <br />TEAM DIRECTORY <br />A5-36 <br />Unit 3.1 Plans and Interior Elevations <br />AO-37 <br />Building A Seventh Floor Exiting Analysis <br />A5-37 <br />Unit 3.2 Plans and Interior Elevations <br />AO-41 <br />Building B First Floor Exiting Analysis <br />A. B. ANCHOR BOLT <br />F.A. <br />FIRE ALARM <br />OSA. <br />OUTSIDE AIR <br />DEVELOPER LOW VOLTAGE SYSTEMS GREEN BUILDING <br />A5-38 <br />Unit 3.2 Plans and Variation <br />AO-42 <br />Building B Second Floor Exiting Analysis <br />Red Oak Investments HCI Systems, Inc. VCA Green <br />ABV. ABOVE <br />F.A.U. <br />FORCED AT UNIT <br />PB <br />PUSH BUTTON <br />4199 Campus Drive 1731 Reynolds Ave 1845 W. Orangewood Ave, Ste 220 <br />A5-39 <br />Unit 3.4 Plans <br />AO-43 <br />Building B Third Floor Exiting Analysis <br />A/C CONDENSING UNIT <br />F.D. <br />FLOOR DRAIN <br />PDR. <br />POWDER ROOM <br />Irvine, CA 92612 Irvine, CA 92614 Orange, CA 92868 <br />A5-40 <br />Unit 3.4 Plan and Interior Elevations <br />AO-44 <br />Building B Fourth Floor Exiting Analysis <br />ACOUST. ACOUSTICAL <br />FDN. <br />FOUNDATION <br />PL. <br />PLATE <br />TEL . 714 342-2502 TEL. 949-724-5000 TEL. 714-363-4700 <br />( ) <br />Andrew Nelson Mike Peters Roshni Lad <br />A5-41 <br />Unit 4.1 Plans and Interior Elevations <br />AO-45 <br />Building B Fifth Floor Exiting Analysis <br />A.D. AREA DRAIN <br />F.E. <br />FIRE EXTINGUISHER <br />PLYWD. <br />PLYWOOD <br />Alex Wong <br />ADJ. ADJUSTABLE <br />F.E.C. <br />FIRE EXTINGUISHER CABINET <br />PLUMB. <br />PLUMBING <br />A5-42 <br />Unit 4.1 Plan and Variations <br />AO-70 <br />Conditions of Approval <br />A.F.F. ABOVE FINISH FLOOR <br />F.F. <br />FINISH FLOOR <br />P.O.C. <br />POINT OF CONNECTION <br />ARCHITECT CIVIL ENGINEER FIRE PROTECTION <br />A5-43 <br />Unit 4.1 Plans and Variations <br />AO-71 <br />Conditions of Approval <br />KTGY ARCHITECTURE +PLANNING Fuscoe Engineering, Inc. Automatic Fire Protection <br />ALT. ALTERNATE <br />F.G. <br />FINISH GRADE <br />PR. <br />PAIR <br />17911 Von Karman Ave., Ste. 200 16795 Von Karman, Suite #100 <br />A5-44 <br />Unit 4.1 Plan Variations <br />AO-72 <br />Conditions of Approval <br />ALUM. ALUMINUM <br />FGL. <br />FIBERGLASS <br />PREFAB. <br />PREFABRICATED <br />Irvine, CA 92614 Irvine, CA 92606 <br />A5-45 <br />Unit 4.2 Plans <br />AO-73 <br />Conditions of Approval <br />APPROX. APPROXIMATE <br />FIN. <br />FINISH <br />TEL. (949) 851-2133 TEL949 474-1960 TEL. 714-841-2066 <br />. ( ) <br />Debbie Holland Josh Ruiz Craig Spicer <br />A5-46 <br />Unit 4.2 Plan and Interior Elevations <br />AO-74 <br />Conditions of Approval <br />ARCH. ARCHITECT <br />F.J. <br />FLOOR JOIST <br />R.A.G. <br />RETURN AIR GRILLE <br />A5-50 <br />Restaurant Enlarged Plan -Level 1 <br />AO-75 <br />Conditions of Approval <br />ASPH. ASPHALT <br />FLR. <br />FLOOR <br />R.C. <br />RESILIENT CHANNEL <br />F.O.C. <br />FACE OF CONCRETE <br />R.D. <br />ROOF DRAIN <br />STRUCTURAL ENGINEER LANDSCAPE ARCHITECT INTERIOR DESIGNER <br />A5-51 <br />Restaurant, Pool Equipment Enlarged Plan - Level 2 <br />AO-80 <br />Geotechnical Report <br />DCI Engineers <br />g LandStudio 360 Ariel Fox Design <br />BA. BATHROM <br />F.O.F. <br />FACE OF FINISH <br />REF. <br />REFERENCE <br />2600 Michelson Dr #930 333 El Camino Real, Studio #200 16 N Marengo Suite 415 <br />A5-52 <br />Retail Enlarged Plan - Level 1 <br />AO-81 <br />Geotechnical Report <br />BD. BOARD <br />F.O.S. <br />FACE OFSTUD/SHEATHING <br />REFR. <br />REFRIGERATOR <br />Irvine, CA 92612 Tustin, CA 92780 Pasadena, CA 91101 <br />A5-53 <br />Retail and Tenant Storage Enlarged Plan -Level 2 <br />AO-82 <br />Geotechnical Report <br />TEL. (949) 892-4956 TEL. (949) 382-5811 TEL. (818) 465-3366 <br />BITUM. BITUMINOUS <br />FIR <br />FRENCH <br />REINF <br />REINFORCED <br />Maggie Clavijo Alex Polen Ariel Johnson <br />A5-54 <br />Leasing & Amenity Enlarged Plan - Level 1 <br />AO-83 <br />Geotechnical Report <br />BLDG. BUILDING <br />FRM'G <br />FRAMING <br />RGTR. <br />REGISTER <br />David Ling Hannah Askey <br />A5-55 <br />Leasing &Amenity Enlarged Plan -Level 2 <br />AO-84 <br />Geotechnical Report <br />BLK. BLOCK <br />FURR. <br />FURRING <br />REQ. <br />REQUIRED <br />MECHANICAL ENGINEER GEOTECHNICAL SIGNAGE <br />A5-56 <br />Leasing &Amenity Enlarged Reflected Ceiling Plan <br />AO-85 <br />Geotechnical Report <br />BLKG. BLOCKING <br />RESIL. <br />RESILIENT <br />Multi Mechancial, Inc Geocon West, Inc. <br />BM. BEAM <br />GA. <br />GUAGE <br />RJ <br />RAFTER JOISTS <br />469 E. Blaine Street 2807 McGaw Ave <br />A5-57 <br />Leasing & Amenity Interior Elevations <br />AO-86 <br />Geotechnical Report <br />BR. BEDROOM <br />GALV. <br />GALVANIZED <br />RM. <br />ROOM <br />Corona, CA 92879 Irvine, CA 92614 <br />TEL. 951-736-6040 <br />A5-60 <br />Clubroom Enlarged Plan -Level 3 <br />AO-87 <br />Geotechnical Report <br />TEL. 949-346-1109 TEL. <br />B.U.R. BUILT -UP -ROOFING <br />GAR. <br />GARAGE <br />R.O. <br />ROUGH OPENING <br />Brandon Abblitt Jelisa Thomas Adams <br />A5-61 <br />Clubroom Enlarged Reflected Ceiling Plan <br />AO-88 <br />Geotechnical report <br />G.B. <br />GRAB BAR <br />A5-62 <br />Clubroom Enlarged Plan - Primary Structural Frame <br />AO-89 <br />Geotechnical Report <br />CAB. CABINET <br />GFCI <br />GROUND FAULT CIRCUIT <br />INTERUPTER <br />SC <br />SOLID CORE <br />PLUMBING ENGINEER DRY UTILITY ACOUSTICAL <br />A5-63 <br />Roof Deck Enlarged Plan <br />AO-90 <br />Geotechnical Report <br />C.B. CATCH BASIN <br />SCHED. <br />SCHEDULE <br />AMPAM DRI Utility Consulting Eilar Associates, Inc. <br />CEM. CEMENT <br />G.I. <br />GALVANIZED IRON <br />SERV. <br />SERVICES <br />17036 Avakon Blvd. 25060 Hancock Ave, Ste 103 #464 210 South Juniper St, Ste 100 <br />A5-64 <br />Mailroom Enlarged Plan & Interior Elevations <br />g <br />AO-91 <br />Exterior Acoustical Analysis Report <br />y p <br />CER. CERAMIC <br />GL <br />GLASS / GLAZING <br />S.F <br />SQUARE FEET <br />Carson, CA 90746 Murrieta, CA 92562 Escondido, CA 92025 <br />A5-70 <br />Stair Al Enlarged Plans <br />AO-92 <br />Exterior Acoustical Analysis Report <br />GLB <br />GLUE LAMINATED BEAM <br />TEL. 310-835-1532 TEL. 951-757-9096 TEL. 760-738-5570 <br />C.I. CAST IRON <br />SGD <br />SLIDING GLASS DOOR <br />Daniel Lucas Dave Ramirez Mo Ouwen a <br />g <br />A5-71 <br />Stair Al Section <br />AO-93 <br />Exterior Acoustical Analysis Report <br />GSM <br />GALVANIZED SHEET METAL <br />C.G. CORNER GUARD <br />SH <br />SINGLE HUNG <br />A5-72 <br />Stair A2 Enlarged Plans <br />AO-94 <br />Exterior Acoustical Analysis Report <br />GYP. <br />GYPSUM <br />CJ CEILING JOIST <br />GYP.BD. <br />GYPSUM BOARD <br />SHT. <br />SHEET <br />ELECTRICAL ENGINEER <br />A5-73 <br />Stair A2 & A3 Section <br />AO-95 <br />Addressing Plans &USPS Approval <br />CLG. CEILING JOIST <br />SHT'G <br />SHEATHING <br />SBE Electrical Contracting <br />2817 McGaw Ave <br />A5-74 <br />Stair A3 Enlarged Plans <br />AO-96 <br />Addressing Plans & USPS Approval <br />CLKG. CAULKING <br />H.B. <br />HOSE BIBS <br />SIM. <br />SIMILAR <br />Irvine, CA 92614 <br />A5-75 <br />Stair A4 Enlarged Plans <br />g <br />AO-97 <br />Addressing Plans & USPS Approval <br />g pp <br />CLO. CLOSET <br />SL <br />SLIDING <br />TEL.714-544-5065 <br />CLR. CLEAR /CLEARANCE <br />HC <br />HOLLOW CORE <br />SPEC. <br />SPECIFICATIONS <br />Eric Grossman <br />A5-76 <br />Stair A4 Enlarged Plans <br />AO-98 <br />Addressing Plans &USPS Approval <br />HDR. <br />HEADER <br />CMU CONCRETE MASONRY UNIT <br />SQ. <br />SQUARE <br />A5-77 <br />Stair A4 Section <br />AO-99 <br />Addressing Plans & USPS Approval <br />HDWD. <br />HARDWOOD <br />COL. COLUMN <br />SSSP <br />SINGLE SHELF SINGLE POLE <br />A5-78 <br />Stair B1 Enlarged Plans <br />AO-100 <br />Addressing Plans & USPS Approval <br />HM <br />HOLLOW METAL <br />CONC. CONCRETE <br />HORIZ. <br />HORIZONTAL <br />SSDP <br />SINGLE SHELF DOUBLE POLE <br />A5-79 <br />Stair B1 Section <br />AO-101 <br />Addressing Plans &USPS Approval <br />CONSTR. CONSTRUCTION <br />STD. <br />STANDARD <br />HVAC <br />HEATING VENTILATING AIR <br />A5-80 <br />Stair B2 Enlarged Plans <br />AO-102 <br />Addressing Plans & USPS Approval <br />CONT. CONTINUOUS CONDITIONING STL. STEEL <br />CORR. CORRIDOR <br />STOR. <br />STORAGE <br />GENERAL NOTES <br />A5-81 <br />Stair B2 Section <br />AO-103 <br />Addressing Plans & USPS Approval <br />CPT CARPET <br />INSUL. <br />INSULATION <br />STRUCT. <br />STRUCTURAL <br />A5-82 <br />Stair B3 Enlarged Plans <br />AO-104 <br />Addressing Plans & USPS Approval <br />CSMT CASEMENT <br />INT. <br />INTERIOR <br />SYM. <br />SYMMETRICAL <br />A5-83 <br />Stair B3 & B4 Section <br />AO-105 <br />Addressing Plans & USPS Approval <br />1. THE CONTRACTOR SHALL REVIEW ALL CONSTRUCTION DOCUMENTS PRIOR TO BID AND START OF <br />CNTR. COUNTER <br />CONSTRUCTION. THE CONTRACTOR SHALL CONFIRM THAT WORK INDICATED IN THE CONSTRUCTION <br />A5-84 <br />Stair B4 Enlarged Plans <br />AO-106 <br />Addressing Plans & USPS Approval <br />CTR. CENTER <br />LAM. <br />LAMINATE <br />T.B. <br />TOWEL BAR <br />DOCUMENTS IS BUILDABLE AS SHOWN. IN THE EVENT A DISCREPANCY IS FOUND IN THE CONTRACT <br />TEL. <br />TELEPHONE <br />DOCUMENTS, THE OWNER AND ARCHITECT SHALL BE NOTIFIED IN WRITING IMMEDIATELY. <br />A5-90 <br />Elevators Al & A2 Plans <br />AO-107 <br />Addressing Plans & USPS Approval <br />LAV. <br />LAVATORY <br />2. THE CONTRACTOR SHALL COMPARE ALL CONSTRUCTION DOCUMENTS WITH THE EXISTING SITE CONDITIONS <br />A5-91 <br />Elevators Al & A2 Sections <br />AO-108 <br />Addressing Plans & USPS Approval <br />DBL. DOUBLE <br />LT. <br />LIGHT <br />TEMP. <br />TEMPERED <br />PRIOR TO BID AND START OF CONSTRUCTION. IN THE EVENT A DISCREPANCY IS FOUND IN THE CONTRACT <br />DEPT. DEPARTMENT <br />TER. <br />TERRAZZO <br />DOCUMENTS, THE OWNER AND ARCHITECT SHALL BE NOTIFIED IN WRITING IMMEDIATELY. <br />A5-92 <br />Elevators B1 & B2 Plans <br />AO-109 <br />Addressing Plans & USPS Approval <br />D.F. DRINKING FOUNTAIN <br />MBR <br />MASTER BEDROOM <br />T&G <br />TONGUE AND GROOVE <br />3. DO NOT SCALE DRAWINGS. REVIEW ALL DIMENSIONS SHOWN ON CONSTRUCTION DOCUMENTS PRIOR TO BID <br />A5-93 <br />Elevators B1 & B2 Sections <br />Al-20 <br />Architectural Site Plan <br />AND START OF CONSTRUCTION. IN THE EVENT A DISCREPANCY IS FOUND IN THE CONTRACT DOCUMENTS, <br />DET. DETAIL <br />MC <br />MEDICINE CABINET <br />TRSM. <br />TRANSOM <br />THE OWNER AND ARCHITECT SHALL BE NOTIFIED IN WRITING IMMEDIATELY. <br />A5-94 <br />Building A Trash Room Plans <br />Al-21 <br />Police Department Building Security Regulations <br />DH DOUBLE HUNG <br />MECH. <br />MECHANICAL <br />T.V. <br />TELEVISION <br />4. FIRE RESISTANCE RATINGS, ASSEMBLIES, CLASSIFICATIONS, STANDARDS AND LISTINGS INDICATED ARE <br />A5-95 <br />Building A Trash Chute Sections <br />Al-22 <br />Police Department Building Security Regulations <br />DIA. DIAMETER <br />TYP. <br />TYPICAL <br />TAKEN FROM VARIOUS REFERENCE STANDARDS. MAINTAIN, AT THE PROJECT SITE, A COPY OF AN <br />APPLICABLE EDITION OF EACH REFERENCE STANDARD. <br />A5-96 <br />Building B Trash Room Plans <br />Al-23 <br />Police Department Building Security Regulations <br />DIM. DIMENSION <br />MEMB. <br />MEMBRANE <br />T.O.SHTG. <br />TOP OF SHEATHING <br />5. REVIEW PLAN LAYOUT, VERIFY AND COORDINATE INTERFACES OF ALL PORTIONS OF THE WORK PRIOR TO <br />DISP. DISPENSER <br />MET. <br />METAL <br />T.O.C. <br />TOP OF CONCRETE OR CURB <br />ACTUAL EXECUTION. <br />A5-97 <br />Building B Trash Chute Sections <br />Al-30 <br />Fire Access Plan <br />DN. DOWN <br />MFG <br />MANUFATURING <br />T.O.P. <br />TOP OF PARAPET <br />6. PROVIDE ALL WORK NECESSARY FOR A COMPLETE PROJECT, INCLUDING ANYTHING WITHIN THE LIMIT OF <br />A5-98 <br />BUILDING B TRASH CHUTE SECTIONS <br />Al-30.1 <br />Fire Flow Test Report <br />WORK, OUTSIDE PROPERTY LINE, ON ADJACENT PROPERTIES AND IN THE PUBLIC WAY. <br />DR. DOOR OPENING <br />MFR. <br />MANUFACTURER <br />T.O.W. <br />TOP OF WALL <br />7. ALL CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES AND <br />A7-00 <br />Dwelling Unit Door Schedule <br />Al-40 <br />Calculated Grade Plane & Building Height <br />DS DOWNSPOUT <br />MIR. <br />MIRROR <br />AMENDMENTS. <br />A7-10 <br />Building A Door Schedule <br />Al-50 <br />Exterior Opening Analysis Building A <br />8. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS AND METHODS, <br />DW DISHWASHER <br />MISC. <br />MISCELLANEOUS <br />U.N.O. <br />UNLESS NOTED OTHERWISE <br />TECHNIQUES, SEQUENCES AND PROCEDURES REQUIRED FOR SAFE EXECUTION OF THE WORK AND FOR <br />A7-20 <br />Building B Door Schedule <br />Al-51 <br />Exterior Opening Analysis Building A <br />DWG'S DRAWINGS <br />MLD'G <br />MOULDING <br />VCT. <br />VINYL COMPOSITE TILE <br />INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMMING IN CONNECTION <br />DWR. DRAWER <br />MTD. <br />MOUNTED <br />VEST. <br />VESTIBULE <br />WITH THE WORK, CONTRACTOR SHALL HIRE SUB -CONTRACTORS AND SUPPLIERS WITH PROVEN ABILITY TO <br />A7-30 <br />Vinyl Window Schedule <br />Al-52 <br />Exterior Opening Analysis Building B <br />PROVIDE AND PERFORM QUALITY WORKMANSHIP ON THIS TYPE OF PROJECT. <br />A7-40 <br />Storefront Schedule <br />Al-53 <br />Exterior Opening Analysis Building B <br />MUL. <br />MULLION <br />E.J. EXPANSION JOINT <br />W.C. <br />WATER CLOSET <br />A7-50 <br />Finish Schedule <br />Al-54 <br />Exterior Opening Analysis Building A Garage <br />EL. ELEVATION <br />NG. <br />NATURALGRADE <br />WD. <br />WOOD <br />AD-01 <br />ACCESSIBLE ROUTES, PARKING NOTES AND DETAILS <br />Al-55 <br />Exterior Opening Analysis Building A Garage <br />ELEC. ELECTRICAL <br />N.I.C. <br />NOT IN CONTRACT <br />WDW. <br />WINDOW <br />AD-02 <br />COMMON & PUBLIC AREA ACCESSIBILITY NOTES & DETAILS <br />Al-56 <br />Exterior Opening Analysis Building B Garage <br />ELEV. ELEVATOR <br />NO. <br />NUMBER <br />W.H. <br />WATER HEATER <br />AD-02.1 <br />COMMON &PUBLIC AREA ACCESSIBILITY NOTES &DETAILS (2) <br />Al-57 <br />Exterior Opening Analysis Building B Garage <br />ENCL. ENCLOSE CY <br />NOM. <br />NOMINAL <br />W.I. <br />WROUGHT IRON <br />DEFERRED SUBMITTALS <br />AD-03 <br />DWELLING UNIT ACCESSIBILITY DETAILS <br />A2-11S <br />Building A First Level Slab Plan <br />ENCL. ENCLOSED <br />N.T.S. <br />NOT TO SCALE <br />W.I.C. <br />WALK-IN CLOSET <br />E.P. ELECTRICAL PANEL <br />WSCT. <br />WAINSCOT <br />AD-04 <br />ELEVATOR DETAILS <br />A2-11 <br />Building A First Level Floor Plan <br />EQMT. EQUIPMENT <br />OBS. <br />OBSCURE <br />THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING THE FOLLOWING DEFERRED SUBMITTALS TO <br />AD-20 <br />FIRE ASSEMBLY PENETRATION KEY PLAN <br />A2-12S <br />Building A Second Level Slab Plan <br />EXH. EXHAUST <br />O.C. <br />ON CENTER <br />THE CITY OFFICIALS FOR REVIEW AND APPROVAL. <br />AD-20.2 <br />ACOUSTICAL ISOLATION DETAILS <br />A2-12 <br />Building A Second Level Floor Plan <br />EXT. EXTERIOR <br />OPNG. <br />OPENING <br />1. ROOF /FLOOR TRUSS SYSTEM <br />AD-20.1 <br />FIRE PENETRATION DETAILS <br />A2-13S <br />Building A Third Level Slab Plan <br />EXT'G EXISTING <br />OPP. <br />OPPOSITE <br />2. SIGNAGE PROGRAM INCLUDING ALL SITE & BUILDING ACCESSIBILITY SIGNAGE <br />AD-21 <br />FIRE -RATED FLOOR -CEILING ASSEMBLIES <br />A2-13 <br />Building A Third Level Floor Plan <br />3. FIRE SPRINKLER SYSTEM <br />4. FIRE ALARM SYSTEM <br />5. SWIMMING POOL & SPA <br />AD-22 <br />AD-22.1 <br />FIRE -RATED INTERIOR WALL ASSEMBLIES <br />1-HOUR FIRE PARTITION DETAILS <br />A2-14 <br />A2-15 <br />Building A Fourth Level Floor Plan <br />Building A Fifth Level Floor Plan <br />LEGALDESCRIPTION <br />VICINITY MAP <br />6. SECURITY SYSTEM <br />AD-23 <br />2-HOUR FIRE BARRIER DETAILS <br />A2-16 <br />Building A Sixth Level Floor Plan <br />PARCEL 1 <br />t �' <br />L, YT. <br />7. METAL STAIRS <br />g. ELEVATORS <br />AD-24 <br />FIRE -RATED EXTERIOR WALL DETAILS <br />A2-17 <br />Building A Seventh Level Floor Plan <br />9. METAL AND GLASS GUARDRAILS <br />AD-25 <br />3-HR RATED FIRE WALL DETAILS <br />A2-18 <br />Building A Roof Plan <br />LOT 1 IN BLOCK 8 OF FRUIT'S ADDITION TO SANTA ANA, AS <br />SHOWN ON A MAP RECORDED IN BOOK 9, PAGE 91 OF <br />10. STOREFRONT SYSTEM <br />AD-26 <br />3-HOUR FIRE BARRIER AT GREASE SHAFT DETAILS <br />A2-20 <br />Building A North & East Exterior Elevations <br />MISCELLANEOUS MAPS, RECORDS OF LOS ANGELES <br />COUNTY, <br />r <br />11. AWNINGS AND CANOPIES <br />AD-27 <br />TILT -UP WALL AT GARAGE <br />A2-21 <br />Building A South & West Exterior Elevations <br />CALIFORNIA. <br />� <br />� <br />PARCEL 2 <br />W <br />w.l <br />►- <br />AD-28 <br />AD-31 <br />FIRE -RATED PRIMARY STRUCTURAL FRAME DETAILS <br />GARAGE DETAILS <br />A2-22 <br />A2-30 <br />Building A Courtyard Elevations <br />Building A Sections <br />I �I <br />LJ <br />THE WEST HALF OF LOT 2 IN BLOCK 8 OF FRUIT'S <br />SANTA ANA, AS SHOWN ON A MAP RECORDED <br />ADDITION <br />IN BOOK <br />TO <br />9, PAGE <br />yy� <br />y <br />^may❑��� <br />AD-32 <br />SLAB ON GRADE DETAILS <br />A2-31 <br />Building A Sections <br />LOG OF ISSUED DOCUMENTS <br />91 OF MISCELLANEOUS MAPS, RECORDS OF LOS ANGELES <br />,a flaAD-33 <br />EXPANSION JOINT DETAILS <br />A2-40 <br />Building A Wall Sections <br />03-18-2022 <br />o <br />50 /o DD PROGRESS SET <br />COUNTY, CALIFORNIA. <br />°� <br />��# <br />AD-41 <br />ELEVATED SLAB DETAILS <br />A2-41 <br />Building A Wall Sections <br />❑ <br />EXTERIOR IMPERVIOUS SURFACE <br />Building A Wall Sections <br />APN: 398-338-08 <br />Ju� <br />AD-41.1 <br />(CON-DEK) <br />A2-42 <br />® <br />OC <br />�� <br />05-20-2022 <br />100% DD PROGRESS SET <br />AD-51.0 <br />EXTERIOR WALL FLASHING DETAILS AT STUCCO <br />A2-43 <br />Building A Wall Sections <br />^ <br />mi <br />��, <br />}�J <br />� <br />08-01-2022 <br />FIRST PLAN CHECK SUBMITTAL <br />AD-51.1 <br />EXTERIOR WALL FLASHING DETAILS AT STUCCO <br />A2-51S <br />Building B First Level Slab Plan <br />3311��1" <br />AD-52.0 <br />EXTERIOR DOOR FLASHING DETAILS AT STUCCO <br />A2-51 <br />Building B First Level Floor Plan <br />PROJECT <br />No SCALE <br />SITE <br />AD-52.1 <br />EXTERIOR DOOR FLASHINIG DETAILS <br />A2-52 <br />Building B Second Level Floor Plan <br />AD-52.2 <br />INTERIOR DOOR DETAILS <br />A2-53 <br />Building B Third Level Floor Plan <br />AD-53 <br />WINDOW DETAILS (FLUSH CONDITION) <br />A2-54 <br />Building B Fourth Level Floor Plan <br />AD-54 <br />WINDOW DETAILS (RECESSED CONDITION) <br />A2-55 <br />Building B Fifth Level Floor Plan <br />AD-55 <br />EXTERIOR IMPERVIOUS SURFACE (PLI-DEK) <br />A2-56 <br />Building B Roof Plan <br />AD-56 <br />EXTERIOR DECK WITH HARDROCK CONCRETE TOPPING <br />A2-60 <br />Building B North & East Exterior Elevations <br />AD-61.0 <br />TPO ROOFING DETAILS <br />A2-61 <br />Building B South & West Exterior Elevations <br />AD-61.1 <br />TPO ROOFING DETAILS <br />A2-62 <br />Building B Courtyard Elevations <br />Architecture + Planning <br />17911 Von Karman Ave. <br />Suite 200 <br />Irvine, CA 92614 <br />ktgy.com <br />949.851.2133 <br />KTGY Project No: 2017-0934 <br />Project Contact: Debbie Holland <br />Email: dholland@ktgy.com <br />Principal: Wil Wong <br />Project Designer: D. Schoolmeester <br />Project Director: Debbie Holland <br />Developer <br />RE I7 OAK <br />INVESTMENTS <br />4199 CAMPUS DRIVE <br />I RV I N E, CA 92612 <br />PHONE NO. (714) 342-2502 <br />1 <br />TF <br />O <br />U <br />Z <br />Z <br />Q <br />U) <br />I- <br />LU <br />NLU <br />V ) <br />w <br />LO <br />LO <br />06 <br />No. Date Description <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />�S�D ARCy�*o <br />No. C29795 <br />RENEWAL DATE <br />AUGUST 31, 223 OF CA' �F <br />License Stamp <br />TITLE SHEET <br />AO-01 <br />N <br />CV <br />r <br />COPYRIGHT U <br />