Laserfiche WebLink
Ordinance No. NS-XXX <br />Page 23 of 38 <br />5. Regular yard inspections by trained personnel shall be included as part of <br />an effective fire prevention maintenance program. <br /> <br />Additional fire protection called for in the plan shall be provided and shall be <br />installed in accordance with this code. The increase of the pile size shall be based <br />upon the capabilities of the installed fire protection system and features. <br /> <br />(d) Section 2808.4 Pile Separation is hereby added as follows: <br /> <br />2808.4. Pile separation. Piles shall be separated from adjacent piles by a <br />minimum distance of 20 feet. Additionally, piles shall have a minimum separation <br />of 100 feet from combustible vegetation. <br /> <br />(e) Section 2808.7 Pile fire protection is hereby revised as follows: <br /> <br />2808.7 Pile fire protection. Automatic sprinkler protection shall be provided in <br />conveyor tunnels and combustible enclosures that pass under a pile. <br />Combustible conveyor systems and enclosed conveyor systems shall be <br />equipped with an approved automatic sprinkler system. Oscillating sprinklers with <br />a sufficient projectile reach are required to maintain a 40% to 60% moisture <br />content and wet down burning/smoldering areas. <br /> <br />(f) Section 2808.9 Material-handling equipment is hereby revised as follows: <br /> <br />2808.9 Material-handling equipment. All material handling equipment operated <br />by an internal combustion engine shall be provided and maintained with an <br />approved spark arrester. Approved material-handling equipment shall be <br />available for moving wood chips, hogged material, wood fines and raw product <br />during fire-fighting operations. <br /> <br />(g) Section 2808.11 Temperature control, is hereby added as follows: <br />2808.11 Temperature control. The temperature shall be monitored and <br />maintained as specified in Sections 2808.11.1 and 2808.11.2. <br /> <br />(h) Section 2808.11.1 Pile temperature control, is hereby added as follows: <br />2808.11.1 Pile temperature control. Piles shall be rotated when the internal <br />temperature readings are in excess of 165 degrees Fahrenheit. <br /> <br />(i) Section 2808.11.2 New material temperature control, is hereby added <br />as follows: <br /> <br />2808.11.2 New material temperature control. New loads delivered to the <br />facility shall be inspected and tested at the facility entry prior to taking delivery. <br />Material with temperature exceeding 165 degrees Fahrenheit shall not be