My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Santa Clara Avenue Bike Lane and Pedestrian Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
11/15/2022 Regular & Special HA
>
Item 12 - Santa Clara Avenue Bike Lane and Pedestrian Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 4:46:01 PM
Creation date
8/14/2023 8:49:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
11/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 23-6997 <br />SANTA CLARA AVE BIKE LANE AND PEDESTRIAN IMPROVEMENTS <br />FROM LINCOLN AVENUE TO PASADENA STREET <br />BID PROPOSAL <br />TO: CITY COUNCIL Or THE CITY OF SANTA ANA <br />FROM: Hardy & Harper, Inc, <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications far the unit priee(S) ar lump sunl(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclnssified Excavation <br />2,160 <br />Cy <br />$ <br />$ <br />1 <br />Uq <br />2 <br />Asphalt Concrete <br />1,170 <br />TN <br />S <br />$ <br />3 <br />Cold Mill (2") <br />7,000 <br />Sr <br />$ <br />$ <br />rice <br />4 <br />Asphalt Rubber Hot Mix <br />300 <br />TN <br />S <br />3 <br />(ARI-IM) <br />_ <br />`�. <br />5 <br />Rubberized Emulsion <br />300 <br />1N <br />$ <br />$ <br />Aggregate Slurry (REAS) <br />TYPE IE <br />6 <br />Crack Sealing <br />I <br />L9 <br />$ <br />$ <br />ix��°" <br />120, O{ <br />7 <br />PCC Sidewalk (T= 4") <br />25,400 <br />SF <br />$ <br />$ <br />11.©o <br />G <br />8 <br />PCC Driveway Approach <br />2,400 <br />SF <br />S <br />$ <br />(T= 8") <br />0 C, <br />5 <br />9 <br />PCC Curb Ramp <br />5,700 <br />SF <br />S <br />$ <br />po <br />10 <br />PCC Curb and Gutter <br />3,500 <br />LF <br />S <br />S <br />(Type A-2-6) <br />tJ` cJ P�' <br />Q <br />I I <br />PCC Curb (13-1) <br />130 <br />LF <br />S <br />$ <br />12 <br />Cross -Gutter (T=9") <br />4,400 <br />SF <br />$ <br />$ <br />od <br />o <br />13 <br />Root Shave/Stump <br />t0 <br />EA <br />$ <br />$ <br />Removal* <br />.1 00 d D <br />P-1 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.