My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Santa Clara Avenue Bike Lane and Pedestrian Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
11/15/2022 Regular & Special HA
>
Item 12 - Santa Clara Avenue Bike Lane and Pedestrian Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 4:46:01 PM
Creation date
8/14/2023 8:49:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
11/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 1 <br />CITY OF SANTA ANA PROJECT NO.23-6997 <br />PROPOSAL <br />PROJECT NO.: 23-6997 <br />SANTA CLARA AVE BIKE LANE AND PEDESTRIAN IMPROVEMENTS <br />FROM LINCOLN AVENUE TO PASADENA STREET <br />BID PROPOSAL <br />T0: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Hard & Harper, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation <br />2,160 <br />CY <br />$ <br />$ <br />ti n <br />Lpu <br />2 <br />Asphalt Concrete <br />1,170 <br />TN <br />S <br />$ <br />—� .04 <br />O <br />3 <br />Cold Mill (2") <br />7.000 <br />SF <br />S <br />$ <br />3I" <br />2t coo <br />4 <br />Asphalt Rubber Hot Mix <br />300 <br />TN <br />$ <br />$ <br />(ARHM) <br />_ <br />�1 <br />5 <br />Rubberized Emulsion <br />300 <br />TN <br />$ <br />$ <br />Aggregate Slurry (REAS) <br />v <br />TYPE II <br />O ` j , <br />6 <br />Crack Sealing <br />I <br />LS <br />$ <br />$ <br />cl° <br />170. 00 <br />7 <br />PCC Sidewalk (T= 4") <br />25,400 <br />SF <br />S <br />$ <br />�I .Oa <br />q <br />8 <br />PCC Driveway Approach <br />2,400 <br />SF <br />S <br />$ <br />(T= 8") <br />1 -po <br />50 <br />9 <br />PCC Curb Ramp <br />5,700 <br />SF <br />S <br />$ <br />C GO <br />10 <br />PCC Curb and Gutter <br />3,500 <br />[ F <br />S <br />$ <br />(Type A-2-6) <br />PCC Curb (B-1) <br />130 <br />L.1= <br />S <br />$ <br />"Jr DD <br />12 <br />Cross -Gutter (T=9") <br />4,400 <br />SF <br />$ <br />$ <br />llrD-111) <br />ll 10 1 <br />13 <br />Root Shave/Stump <br />to <br />EA <br />$ <br />$ <br />Removal* <br />P- l of P- l 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.