Laserfiche WebLink
WINDOW BOARDING SPECIFICATION <br />D <br />II------------------------------ <br />I <br />I <br />A <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />3 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />I 1 <br />- <br />• <br />I <br />A <br />\1 <br />I 7� <br />------------------------------ <br />WINDOW - OUTSIDE VIEW <br />NOTES: <br />1/2" CDX PLYWOOD <br />CUT TO TO COVER <br />WINDOW OPENING <br />SECURE TO STRUCTURE <br />WITH 1-5/8" (6D) <br />GALVANIZED NAILS <br />�L. <br />2 X 4 BRACE <br />CUT TO OUTSIDE <br />DIMENSION OF <br />WINDOW TRIM <br />2 X 4 BRACE <br />CUT TO SIZE OF <br />PLYWOOD <br />3/8" CARRIAGE BOLT <br />12" LONG/COURSE THREAD <br />NUT TO MATCH, WASHERS INSTALLED <br />ON BOTH SIDES <br />ROUNDED HEAD OF BOLT ON OUTSIDE <br />L- <br />1. FOR DOUBLE HUNG WINDOWS, SLIDE SASH TO CENTER OF UNIT AND PASS BOLTS <br />THROUGH OPENINGS AT TOP AND BOTTOM. <br />2. STORM WINDOWS SHOULD BE REMOVED AND STORED INSIDE STRUCTURE. <br />3. OUTSIDE TRIM MAY HAVE TO BE REMOVED TO ACCOMMODATE A FLUSH AND <br />TIGHT FIT. <br />4. TIGHTEN NUTS FROM INSIDE ENOUGH TO SLIGHTLY COMPRESS 2X4 BRACE. <br />5. BRACE LOCATIONS: A = 1/3 B (SEE DIMENSION LOCATIONS ON DRAWING) <br />NOTE: WINDOWS 3 FEET IN HEIGHT OR SHORTER ONLY REQUIRE ONE <br />BRACE. <br />6. LOCATION OF BOLT HOLES: C = 1/3D (SEE DIMENSION LOCATIONS ON DRAWING) <br />7. THE PLYWOOD BOARD SHOULD BE SECURED WITH SCREWS EVERY 12" ALONG <br />THE PERIMETER OF THE FRAME OF THE WINDOW, DOOR, OR OPENING, AND WITH <br />DECK NAILS AT EVERY 6" MARK WHERE SCREW IS NOT PLACED. <br />City of Santa Ana RFP 22-091 <br />Page Al-4 <br />Doc ID: 3bfbb52dl9c5298a402dll9d54dlabfcObl9l23e <br />