My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - DTSA 2022 Holiday Décor
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
11/15/2022 Regular & Special HA
>
Item 19 - DTSA 2022 Holiday Décor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 8:56:20 AM
Creation date
8/14/2023 8:56:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
11/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BrightLife Designs LLC <br />16351 Gothard St, STE C, Huntington Beach, CA 92647 <br />Phone: 714-326-8326; Direct : 714-372-2274 <br />www.Brightlifedesigns.com <br />September 22, 2022 <br />Contact Name: Julie Castro <br />Title: Economic Development Specialist II <br />Client Name: City of Santa Ana <br />Email: JCastro5@santa-ana.org <br />Phone: (714) 647-6585 <br />City of Santa Ana Holiday Proposal 2022 V4 <br />“PROPOSAL” <br />Installation, Removal & Storage of Customer Owned Decorations <br />Labor for all rental decorations included <br />SUMMARY REPORT: <br />-Bow and Garland Décor on Lamp Posts <br />-Lighted Elements, Enhancement options (see separate - Spec Sheet). <br />-City Wide Décor <br />-New Additional Items Proposed <br />DETAILED REPORT: <br />Existing Lamp Post Décor – on 4th Street (from French St. to Ross St.) <br />- <br />- Installation of seventy-nine (79) Light Posts with 10’ sections of decorated garland two (2qty) per pole. <br />-Customer owned decorations. Price includes Labor for installation, removal & storage of customers décor. <br />-(158) total of 24” Red Bows with gold trim. Each Light Post will have a bow on either side, (2) bows per pole. <br />-Labor Cost Per kit is $160 each. <br />Labor Installation, Removal Cost $12,640.00 <br />Storage Cost $3,800.00 <br /> Total $16,440.00 <br />Purchase of New Light Pole Kits <br />- <br />- Five (5) New 24” Double Bow Accent Kit with Red Bows, 10’ of Mountain Pine Garland with Red and Gold Décor. <br />Unlit. <br />-Labor & storage for Five (5) New 24” Double Bow Accent Kit (2) Gold bows, 10’ of Mountain Pine Garland with <br />Red and gold décor. Unlit. <br />Purchase of New Kits Price Per Each $495.00 <br />Labor Installation, Removal & Storage Per Each $160.00 <br />Total $3,275.00 <br />10’ Lighted Seating Teddy Bear <br />-One (1) 10’ Lighted Giant Teddy Bear, installation, and removal at Plaza Calle Cuatro. <br />Lease Price $11,995.00 <br />Exhibit A-1 to the First AmendmentEXHIBIT 1
The URL can be used to link to this page
Your browser does not support the video tag.