Laserfiche WebLink
Housing Division Quarterly Report <br />November 15, 2022 <br />Page 7 <br />3 <br />0 <br />6 <br />5 <br />Affordable Housing Development Projects <br />There are five (5) affordable housing projects under construction, and two (2) affordable <br />housing projects in pre-development. Below is a brief summary and status-update for <br />each project. Exhibit 2 provides a development timeline for each project. The most <br />recent RFP for Affordable Housing Development, which was issued on December 8, <br />2021 and closed on February 28, 2022, received three eligible proposals, in which one <br />proposal, WISEPlace PSH, has been awarded a pre-commitment letter, and the two <br />other proposals are currently in the review and evaluation phase. <br />Projects under Construction <br />Legacy Square (609 N Spurgeon Street) <br />Developer National Community Renaissance with Mercy House as the service provider <br />Description <br />New construction of a 100% affordable multifamily apartment complex <br />consisting of 92 units of rental housing and one (1) manager’s unit. All units <br />will be affordable to households earning less than 60% AMI of which 33 <br />units will be set-aside for permanent supportive housing. <br />Authority <br />Funds Eight (8) Project-Based Vouchers (PBVs) <br />Update <br />Construction is currently underway and on schedule. Specifically, the <br />scaffold has been removed on the Courtyard East, North & South elevation <br />in addition to the exterior of the South, West and North elevation. Water <br />proofing, and installation of CMU block has begun at the planter wall areas <br />on the podium level. Construction is underway for the interior units. Vinyl <br />flooring, installation of interior doors and kitchen cabinets are being worked <br />on the first and third levels. The Second level is currently being painted. The <br />estimated completion date is February 2023. <br />North Harbor Village (1108 N Harbor) <br />Developer Jamboree Housing Corporation <br />Description Acquisition and rehabilitation of a former motel yielding 89 units of <br />permanent supportive housing. <br />City / Authority <br />Funds <br />CDBG ($1,687,047); Eight-nine (89) PBVs consisting of 34 HUD-VASH <br />PBVs and 55 non HUD-VASH PBVs. <br />Update <br />Construction is currently underway. Recent activities include framing for the <br />new community building, putting up the trash enclosure, completing the <br />roofing/framing repairs on the existing buildings, adjustments to the cell <br />tower equipment, work on concrete walkways, pouring of the concrete on <br />the Harbor Blvd. facing patios, trenching for underground plumbing, and <br />digging footings for the outside shadestructure. The team has been looking <br />for solutions to address some of the difficult waterproofing conditions that <br />exist on site. In their efforts to come up with solutions they found that they <br />also need to address the poor condition of the existing piping for the fire <br />sprinkler system and ended up having to include new piping. Due to the <br />additional construction work, the new estimated completion date is May <br />2023. <br />Westview House (2530 Westminster Avenue)