Laserfiche WebLink
Proposal for <br />Various Environmental Services <br />#114OW$ Page 30 <br />August 1, 2022 <br />Type: Category I & II <br />Client: Los Angeles Community College District <br />Project Involvement: 2020-March 2022 <br />Disclaimer: Mr. Toosi secured this contract and <br />managed it at his previous role as the vice president <br />of Rubicon Engineering Corporation. A -Tech still is <br />Rubicon's subcontractor and provided services in <br />collaboration with Mr. Toosi. <br />Project Description: In 2019, A -Tech as part of the <br />Rubicon Team was awarded an on -call environmental consulting services contract with the Los Angeles <br />Community College District to provide various environmental services including asbestos and lead <br />sampling and monitoring, limited environmental investigation, and waste characterization investigation. <br />We have since received multiple task orders and established a working relationship with the Los Angeles <br />City College project team. In 2020, we completed a comprehensive survey of hazardous materials for <br />the Central Plant Phase II renovation project, which assisted the client to comply with requirements of the <br />South Coast Air Quality Management District (SCAQMD) Rule 1403. As a testament to our ability to <br />respond to emergency situations, we conducted and completed an emergency project with short notice <br />and turnaround for the Cesar Chavez Street emergency project. We mobilized to the site with the same <br />day delivery of results, conducted inspection and sampling of a suspected transite pipe, prepared a <br />SCAQMD Procedure 5 Work Plan, oversaw abatement activities, conducted clearance inspection, and <br />provided a close-out letter. Due to the fast -paced nature of this job we completed this project within 20 <br />working days, 10 days of which were spent waiting for the SCAQMD and Cal -OSHA notifications. <br />In another task order, Mr. Toosi managed and conducted a limited soil investigation project at the Los <br />Angeles City College to evaluate any potential contamination at the proposed Cesar Chavez Admin <br />Building construction site. Our team arranged for mobilization to the site and collected 40 soil samples at <br />various depths and analyzed them for any potential hazardous contaminant groups. Due to the ongoing <br />construction activities the project required faster turnaround time than usual. The College managers were <br />delighted with Mr. Toosi's responsiveness and quick attention to this project. <br />Key Personnel: Mr. Toosi was the project manager, Mr. Williams was the HazMat Survey lead, and Dr. <br />Robles is the risk assessment expert for this contract. <br />ow A -Tech Consulting, Inc. <br />