0 <br />Proposal for <br />Various Environmental Services <br />Table S. Chronological List of Historical Events at the Former Arco Gas Station <br />Page 36 <br />August 1, 2022 <br />Document Date <br />Document Type <br />Consultant/Agency <br />Notes <br />Dormancy status (redo... sampling f equ...y to semi-annual basis/ monitoring to only 3 wells) rejected due to: <br />Elevated/Fluctuating Levels of Fuel Oxygenates present in perimeter, Wall BH-8 (adjaeent to western <br />January 05 2005 <br />Request for Dormancy <br />Delta Environmental Consultants <br />USTIOispe...r ). High concentrations of Benzene in Wall BH-2 (former UST.; Southeast boundary) not wall <br />defined. Sampling frequency (reduced from quarterly to annually) of Wells BH 1,11,12,13,14, and 18. Sampling <br />frequency (must remain quarterly) for wells BH-6, 10 and remainder of Wells <br />Quarterly Update Report <br />Report aubmittad January 27, 2005: <br />January 27 2005 <br />Submittal <br />Delta Environmental Consultant. <br />Verbiage for previous quarters update report was Incorrectly left in this repo:. Resubmitted February T, 2005 <br />Work Plan for Additional <br />Proposed Scope of We-: <br />January 28 2005 <br />Groundwater <br />Delta Environmental Consultants <br />Install anew monitoring well I ... tad ... [/southeast of the former UST., a 1v.... one soli boring BH-19 to a <br />Assessment <br />depth of 22 it bgs and place screen from 5 ft bgs to total depth <br />Resubmittal correcting previous Quarterly Submittal (4th Quarter 20") Jan 30, 2005: <br />February OT 2005 <br />Quarterly Update Report <br />Della Environmental Consultants <br />Grou-i-st., monitoring ...ducted (no -purge sampling) D... mber 17, 20" <br />Submittal <br />Analyzed for THG-g, BTEX, MTBE. Groundwater was not collected for Wells ON. 1, 11 through 14, and 18 <br />Workplan for Additional <br />Water Board Approved: <br />February 15 2005 <br />Groundwater <br />Santa Ana Water Board <br />One additional groundwater monitoring will be installed (to delineate lateral extent of high benzene <br />Assessment <br />,ntmtl... ) In well BH-2 (east-southeast of UST exeavatlon/adjaeent residential complex) <br />Request to cancel additional work plan Implamant.U.. because the utility location and geophysical survey <br />Request to Rescind <br />ques <br />ondu.t.d on April 21, 2005, concluded the proposed well could not be safely installed. It was requested that <br />June 09 2005 <br />AGroundwater <br />Additional <br />Della Environmental Consultants <br />alternative site eharocterizallon melhotla to be consitlerea or requirement of additional assessment to be <br />Assessment <br />.gma.a <br />Revised Work Plan for <br />May 15 2006 <br />Additional Ground Water <br />Della Environmental Consultants <br />Request to rescind from June 09, 2005 was denied through a phone call conversation on June 22, 2005 <br />Assessment <br />Location of BH-19 revised to avoid utility interference <br />On July 3, 2006 the proposed location of BH-19 was adjusted because a 12-inch concrete piping was found in the <br />proposed revised location, therefore the well location was moved 3 feet North <br />August 17 2006 <br />Off -Site Well Installation <br />Delta Environmental Consultants <br />No detectable concentrations of benzene, toluene, ethylb... e c, total xylenes, MTBE, TBA, DIPE, ETBE, TAME <br />Status Report <br />or ethanol were found for the soil collected from BH-19. Soil Sample BN-19-10 has no detectable concentrations <br />of BTEX, MTBE or TBA but had TPH-g .....nation of 290 mg/kg <br />Resolution No. 2009-0042 was ad.pt.d May 19, 2009 this resolution mandates that agencies reduce quarterly <br />monitoring requirements to a semi-annual basis unless sit¢ specific needs warrant otherwise: <br />July 28 2009 <br />Staff Letter <br />Santa Ana Water Board <br />Based on evaluation Wall. BH 2 through 4, T through 9, and 15 through 17 may be reduced to semi-annual <br />mpling schedule <br />Proposed adv... ent and sampling of 3 boring samples (C3B-1 through 3) In the areas of former dispenser <br />August 31 2011 <br />Work Plan for <br />Stratus Environmental, Inc. <br />island, UST. and product lines. <br />Co motion Soil Borings <br />Samples will be analyzed for Gasoline Range Organics, BTEX, MTBE, DIPE, ETBE, TAME, TBA and ethanol <br />Revised Workplan for <br />Advancement. of proposed soil boring location of August 31, 2011 to a depth of 15 ft Bgs, approximately 5 it <br />November 10 2011 <br />Confirmation Soil Borings <br />Stratus Environmental, Inc. <br />into groundwater <br />Approval of Revised Work Plan for Confirmation Soil Borings dated November 16 ,2011 where 3 soil borings be <br />January 05 2012 <br />Staff Letter <br />Santa Ana Water Board <br />advanced to approximately 15 feet bgs and samples eollaet,d from each borehole at 5-foot intervals <br />Air monitoring conducted during exeavatlon activities during March 3, 2012 where the breaking and removal of <br />April OB 2012 <br />Rule 1166 Soil Monitoring <br />Stratus Environmental, Inc. <br />asphalt and excavation of pea gravel and soil was conducted. <br />Report <br />VOC concentrations were not detected during excavation activities <br />First Quarter 2012 jApol 30, 2012): <br />work performed this quarter. submitted in the Quarterly Monitoring Report, Fourth Quarter 2011 on January 30, <br />April 30 2072 <br />Quarterly Status Report <br />Stratus Environmental, Inc. <br />2012. No groundwater.ample. ware collected. Implemented the Revised Work Plan for Confirmation Soil <br />Borings, dated November 10, 2011, on March 15 and 16, 2012 <br />Confirmation of four soil borings to 15 ft bgs (CSB 1 through 4) <br />Elevated concentrations of petroleum hydrocarbons, including benzene, were detected in ne r surface soils in <br />May 14 2012 <br />Confirmation Soil Boring <br />Stratus Environmental, Inc. <br />areas corresponding to both the former tanks and western dispans¢r area. The highest concentrations of TPH-9, <br />Report <br />benzene, xylenes, TMBs and naphthalene were encountered in CB-1 (10 feet bgs; southeast corner of site). <br />Residual hydrocarbons were detected to total depth at all four drill locations <br />Be.etl on the results of the Confirmation Soil Boring Report, agency required air-sparge wells AS-1 and AS-2 to <br />July 12 2012 <br />Staff Letter <br />Santa Ana Water Board <br />be sampled during next groundwater event, and soil vapor survey and risk assessment to be completed to <br />determine the potential vapor intrusion threat posed by shallow residual contamination <br />Non-compliance, failing to respond to directive, which required that a soil vapor survey and risk assess m¢nt to <br />February 28 2013 <br />Staff Letter <br />Santa Ana Water Board <br />be performed to evaluate the potential threat to human health posed by the elevated residual petroleum <br />hydrocarbons enc unt.red in soils during confirmation sampling. <br />Response to Non -Compliance by Straus: The newly adopted [at the time] Low.Threat Closure policy stales <br />evaluation of the potential petroleum vapor intrusion to indoor air is not required at active commercial <br />March 29 2013 <br />Workplan for Shallow Soil <br />Stratus Environmental, Inc. <br />petroleum fueling facilities, lithology of subject site indicated release characteristics do not pose a threat to <br />Vapor Survey <br />pen gency's request, prepare a <br />human health. To res d to a t, however, Straus will Work Plan to conduct a risk <br />ent and a shallow sell vapor survey In general accordance with the DTSC Advisory <br />Work Plan Approved, but all hydrocarbon related compounds with established screening levels must be <br />quantified to sufficiently low limits to allow for comparison against California Human Health Screening Levels <br />May 23 2013 <br />Staff Letter <br />Santa Ana Water Board <br />(CHHSL.). Due to the very close proximity of adjacent residential structures, the resulting site data must be <br />valuated under both commercial and residential exposure scenario <br />Responsibility of the Arco Site had transferred from Atlantic Richfield Company to Tesoro Refining and <br />July 3 2013 <br />Owner Letter <br />Tesoro Refining & Marketing, LLC <br />Marketing, LCC effective June 1, 2013 <br />Workplan for Additional <br />Two (2) hand -auger borings be advanced In the vicinity of the current and former waste ell lank, In order to <br />April 30 2014 <br />Site Assessment <br />Stratus Environmental, Inc. <br />collect more detailed information on subsurface conditions near this potential area of concern. <br />Additional Site <br />In order to assess the presence of petroleum hydrocarbons In the vicinity of the existing waste oil tank, two soil <br />August 22 2014 <br />Assessment Report <br />Stratus Environmental, Inc. <br />borings (HA-1 andHA-2) ware advanced and results were presented. <br />Regional Board staff has determined this environmental cleanup case eligible for site closure. Groundwater <br />October 30 2014 <br />Determination of <br />Santa Ana Water Board <br />monitoring and sampling activities may be reduced to an annual frequency (performed 2nd Quarter) pending site <br />Eligibility for Closure <br />closure <br />Work Plan to perform additional soil sampling associated with the removal of the underground storoge tanks <br />Work Plan fo r Soil <br />(USTs), waste oil tank, hydraulic hoist, fuel dispensers and product piping. <br />May 7 2079 <br />Borings and oil <br />Stratus Environmental, Inc. <br />Sampling of fourteen soil borings associated with USTs, waste oil tank, and hydraulic lifts and the collection of <br />Piping Sampling <br />oil samples along the product piping and fuel dispense - <br />Destruction of eleven onsite groundwater monitoring wells (BN-1 through BN-4, BN-6, BN-8, and BN-13 through <br />September 6 2019 <br />Well Destruction Report <br />Stratus Environmental, Inc. <br />BH-11 antl two o site dual nested air-sparge wells (AS-1 and AS-2) The wells were removed to facilitate site <br />tlemolition asset ated with the City of Santa Ana's street widening project <br />Communications on October 8 and 21, 2019 and January T, 2020 between Regional Water Board staff and State <br />Revised Review <br />Water Boartl staff, the following scope was disco ... d and agreed upon: The Site meets LTCP criteria for current <br />January 23 2020 <br />Summary Report - <br />State Water Resources Control <br />relal land use, It Is reasonable to re-evaluate Site conditions against the Policy when the future property <br />Concur with Closure <br />Board <br />us.has been determined, Responsible party should contact the Department of Water Resources to <br />onfirm/verify the location of the supply well, supposedly located less than 500 feet east of the Site. <br />Concurrence of Site <br />Closure Recommendation <br />Evaluated nearby water -supply walls and confirmed that the walls do not exist. No further groundwater sampling <br />May 6 2020 <br />8 Cancellation of Annual <br />Stanlee Consulting Services Inc. <br />of the six off -site street groundwater monitoring wells was needed <br />Groundwater Sampling <br />Notification of Case <br />Based on available data, the gasoline contamination in soil and/or groundwater beneath the site appears to have <br />May 4 2021 <br />Closure <br />Santa Ana Water Board <br />been adequately d and mitigated and environmental ease closure may appropriate be a late at this time. <br />qua y assess. ga <br />Well Destruction <br />Removal and/or abandonment of all walls and other site improvements related to the underground storage tank <br />September 9 2021 <br />Directive <br />Santa Ana Water Board <br />cleanup must be done before a final case closure summary <br />The destruction of six off -Site groundwater monitoring well. (BH-T, BH-9 through BH-12, and BH-18) part ormea <br />November 23 2021 <br />Well Destruction Report <br />Stantec Consulting Services Inc. <br />November 8 through 10, 2022 <br />Agency finds that the site investigation and corrective action carried out at the above-r.f.r.n..d UST site is in <br />March 23 2022 <br />Closure Letter and Final <br />Santa Ana Water Board <br />c mpliance with the requirements and with corrective action regulations set and that no further action related <br />Gas¢ Summary <br />to the petroleum releases(.) at the site is required. <br />40 A -Tech Consulting, Inc. <br />