Laserfiche WebLink
Table E: Sample Cost Proposal for Phase II ESA of Former Arco Gas Station <br /># <br />Task/Activities <br />Personnel <br />Project <br />Manager <br />CIH <br />Senior <br />Level Staff <br />Project <br />Level Staff <br />Staff Level <br />Field <br />Technician <br />CAD/GIS <br />Tech <br />Expenses(l) <br />Cost per Task <br />Rate (hr) <br />$200.00 <br />$215.00 <br />$140.00 <br />1 $125.00 <br />$110.00 <br />$105.00 <br />$100.00 <br />Unit Rate <br />Quantity <br />Cost <br />Number of Hours/Subtotal <br />1 <br />Task 1- Work Plan, HASP, and Agency Notifications <br />2 <br />Work Plan and HASP Preparation <br />1.0 <br />1.0 <br />2.0 <br />0 <br />12 <br />0 <br />4 <br />$2,415.00 <br />3 <br />Subtotal <br />$200.00 <br />$215.00 <br />$280.00 <br />$0.00 <br />$1,320.00 <br />$0.00 <br />$400.00 <br />$2,415.00 <br />4 <br />Task 2 - Field Oversight and Sampling <br />5 <br />USTRemoval Oversight <br />2 <br />0 <br />0 <br />0 <br />0 <br />10 <br />0 <br />$1,450.00 <br />6 <br />Lab Cost(2) (TPH, Metals, and VOCs assuming 30 samples) <br />1 <br />$12,500.00 <br />$12,500.00 <br />7 <br />Geophysics <br />1 <br />$700.00 <br />$700.00 <br />8 <br />Drillers Cost <br />1 <br />$3,500.00 <br />$3,500.00 <br />9 <br />Subtotal <br />$400.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$1,050.00 <br />$0.00 <br />$18,150.00 <br />10 <br />Task 3 - Report Preparation <br />11 <br />Report Preparation and Data Evaluation <br />1 <br />1 <br />8 <br />0 <br />24 <br />0 <br />0 <br />$4,175.00 <br />12 <br />Subtotal <br />$200.00 <br />$215.00 <br />$1,120.00 <br />$0.00 <br />$2,640.00 <br />$0.00 <br />$0.00 <br />$4,175.00 <br />13 <br />Total Labor Cost <br />$800.00 <br />$430.00 <br />$1,400.00 <br />$0.00 <br />$3,960.00 <br />$1,050.00 <br />$400.00 <br />$8,040.00 <br />14 <br />Total Number of Hours <br />4 <br />2 <br />10 <br />0 <br />36 <br />10 <br />4 <br />66 <br />1s <br />Total Expenses <br />$16,700.00 <br />16 <br />Total Project Cost <br />r$24,740.00 <br />Notes: <br />1) Expenses refer to subcontractor costs, laboratory analysis, equipment, materials, and other project related direct costs. <br />2) For lab cost A -Tech assumed that initially total of 30 samples (1-, 5-, and 10-foot samples from 10 borings) will be analyzed for Metals, TPH, and VOCs as described in the proposal. <br />The unit cost of these analyses is provided in Table A.2 <br />0 A -Tech Consulting, Inc. <br />