My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Arc Flash Analysis and Safety Program Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/18/2022 Special and Regular
>
Item 17 - Arc Flash Analysis and Safety Program Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 11:34:49 AM
Creation date
8/14/2023 11:58:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
10/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P2SENG <br />June 2, 2022 <br />Attn: Armando Fernandez, Project Manager <br />City of Santa Ana <br />Subject: Arc Flash Analysis And Electrical Safety Program Development <br />Public Works Agency <br />RFP NO.: 22-023 <br />220 S. Daisy Avenue, <br />Bldg A <br />Dear Selection Committee, <br />Santa Ana, CA 92703 <br />Thank you for this opportunity to submit our proposal and qualifications to provide <br />electrical engineering services for an Arc Flash Analysis And Electrical Safety <br />Program Development for equipment assets owned and operated by the City of <br />Santa Public Works Agency. We have reviewed the RFP and are confident that P2S <br />has the history and experience in performing these studies and analysis, and that <br />our selected team of engineers will complete the tasks listed on the RFP on time <br />and in accordance to your standards. <br />P2S is familiar with water facilities. We've worked with different authorities and <br />municipalities since 2005, on projects including arc flash analyses and studies, <br />as well as electrical systems design. Our engineering staff includes a licensed <br />water treatment and distribution operator J2 and D2) who has worked in water <br />operations for more than 10 years. <br />Additionally, P2S has been providing engineering design and services for over <br />31 years. These include arc flash studies for the Palmdale Water District, City of <br />Anaheim Water Department, and Elsinore Valley Municipal Water District, as well <br />as power system upgrades for many municipal, industrial and education clients. <br />The team selected for this project are responsive and dedicated to support your <br />staff. <br />Agreement Statement <br />P2S has only one concern regarding the provisions contained in the standard <br />agreement. On item 7 e (4), P2S can only provide additional insured <br />endorsements on general liability and automobile policies. We cannot add <br />others to our professional liability or workers' compensation insurance. <br />Otherwise, P2S is prepared to execute the contract as written. <br />We sincerely believe you will find that P2S has the right people, expertise, and <br />track record to become a valuable engineering partner for the City of Santa Ana <br />Public Works Agency. <br />Sincerely, <br />G ____MN <br />Aravind Batra, PE, LEED AP, LC <br />P2S Inc. Vice -President, Principal <br />5000 East Spring Street, Ste 800 0 564J+97.2999 Q P2SINC.COM <br />Long Beach, CA 90815 <br />
The URL can be used to link to this page
Your browser does not support the video tag.