My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Arc Flash Analysis and Safety Program Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/18/2022 Special and Regular
>
Item 17 - Arc Flash Analysis and Safety Program Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 11:34:49 AM
Creation date
8/14/2023 11:58:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
10/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEAM EXPERIENCE CITY OF SANTA ANA PUBLIC WORKS <br />P2S INC. ARC FLASH ANALYSIS & ELECTRICAL SAFETY PROGRAM <br />ORGANIZATION CHART <br />The organization chart below shows the key personnel that comprise our team. Individual resumes for each team <br />member are also included on the following pages with relevant project experience. <br />h1:LV/1►1P]%1111:Z1 <br />PE, LC, LEED AP BD+C <br />Principal in Charge, <br />Senior Electrical Engineer <br />Availability:10% <br />DANIEL IHLENFELDT <br />PE, LEED AP BD+C <br />Project Manager, Electrical Engineer <br />Availability: 50% <br />MARCO CABIBBO HAMPTON TEDDER ELECTRIC AARON CHEE <br />PE, LEED AP BD+C PE, LC, LEED AP BD+C <br />Senior Electrical Engineer Senior Electrical Engineer <br />Quality Control Availability: 30% <br />Availability: 30% <br />
The URL can be used to link to this page
Your browser does not support the video tag.