My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Arc Flash Analysis and Safety Program Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/18/2022 Special and Regular
>
Item 17 - Arc Flash Analysis and Safety Program Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 11:34:49 AM
Creation date
8/14/2023 11:58:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
10/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEAM EXPERIENCE <br />P2S INC. <br />CITY OF SANTA ANA PUBLIC WORKS <br />ARC FLASH ANALYSIS & ELECTRICAL SAFETY PROGRAM <br />EDUCATION <br />AARON CHEE <br />PE, LC, LEED AP BD+C <br />Senior Electrical Engineer I P2S Inc. <br />Aaron Chee has provided electrical designs on a wide variety of education <br />facilities. His responsibilities have included power and lighting designs, fire <br />alarm systems, construction support, lighting photometric studies, breaker <br />coordination studies, arc flash studies, power system field surveys, and cost <br />estimates. <br />BS, Electrical Engineering, <br />Aaron's roles have included serving as a project manager, construction <br />California State University <br />administrator and the lead electrical design engineer on several large building <br />Long Beach <br />projects. As a construction administrator, his duties included conducting <br />REGISTRATIONS <br />construction meetings, creating change proposals, submittal reviews, <br />coordination between owner and contractor and technical support. Aaron <br />Electrical Engineer, <br />strives to provide electrical designs that are energy efficient, cost effective, on <br />California E21080 <br />schedule and meet the client's needs. <br />CERTIFICATIONS <br />• LEED AP BD+C <br />RELEVANT PROJECT EXPERIENCE <br />• LC Credential (NCQLP) <br />. City of Monrovia • Palmdale Water District <br />AFFILIATIONS <br />Arc Flash Study Arc Flash Study <br />• IEEE <br />Monrovia, CA Palmdale, CA <br />• UC Davis Medical Center • University of Nevada, Reno <br />Coordination and Arc Flash Study Environmental Research Facility <br />Sacramento, CA Renovation <br />Reno, NV <br />• Cal Poly Pomona <br />Coordination and Arc Flash Study <br />Pomona, CA <br />• Craf ton Hills College <br />Coordination and Arc Flash Study <br />Yucaipa, CA <br />• LA Southwest College <br />Switchgear Maintenance and Arc <br />Flash Study <br />Los Angeles, CA <br />• South Coast Water District <br />Arc Flash Study <br />Orange, CA <br />• San Diego State University <br />Campus Wide Electrical System <br />Assessment <br />San Diego, CA <br />• Aberdeen Proving Grounds <br />Load Flow and Short -Circuit Study <br />Aberdeen, MD <br />• Santa Monica College <br />Math and Science Building <br />Santa Monica, CA <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.