Laserfiche WebLink
<br />o <br />o <br />o <br />o <br />Site Layout/Construction Plans And Details (including plumbing) <br />Site Sections, as applicable <br />Planting Plans/Details/Notes <br />Irrigation Plans/Details/Calculations/Notes <br />Architectural <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />Demolition Plans <br />Construction Plans <br />Reflected Ceiling Plans <br />Exterior Elevations <br />Interior Elevations <br />Mechanical and Plumbing Plans/T-24 <br />Electrical Plans, as applicable <br />Architectural Details <br />Structural Calculations <br />Door/Window/Finish Schedules, as applicable <br />ADA Path of Travel design and/or signage Plan <br />Structural Engineering <br />o Structural Design and Detailing <br /> <br /> <br />Mechanical Engineering & Plumbing <br />Electrical Engineering <br />o <br />o <br />o <br />o <br />o <br />o <br />Electrical Site Plan to include walkway/parking lot lighting, irrigation <br />Photometrics <br />Location of panels, switchgear, meters <br />Schedules <br />Details <br />Notes, specifications <br />Plan Check & Permits: <br />Construction drawings shall be in accordance with the 2019 California Building Code and will require <br />review/approval by the City Planning and Building Agency. <br />As a condition of plan check approval, plans, specifications and structural calculations must be signed by a <br />California licensed architect / landscape architect /civil engineer/structural engineer as appropriate. <br />Additionally, the architect will be encouraged to identify their historic consultant to address questions and <br />concerns related to the historical preservation of the building. Plans shall be organized so that they can be <br />segregated cleanly for distribution to the various plan checking entities. <br />Construction drawings shall be submitted at 90% completion for review by Public Works CIP Engineering and <br />revised per their comments. The 100% complete construction drawing package will then be submitted for final <br />City review to the following City Agencies: <br /> <br /> <br /> <br /> <br /> <br /> <br />City Manager Office <br />Parks, Recreation, and Community Services Agency <br />Library Services Agency <br />Human Resources Agency <br />Planning and Building Agency <br />Public Works Agency CIP Engineering Division <br />The Public Works Agency Project Manager will coordinate the submittal and review process. Once complete, <br />the consultant will revise the Contract Documents <br />City of Santa Ana RFP 22-062 <br />Page A1-4