My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve an Appropriation Adjustment, Amend CIP, & Award Construction Contract for the Flower Street Bike Trail Renovation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
09/20/2022 Special and Regular
>
Item 11 - Approve an Appropriation Adjustment, Amend CIP, & Award Construction Contract for the Flower Street Bike Trail Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 9:07:19 AM
Creation date
8/14/2023 2:31:57 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
9/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Flower Street Bike Trail Renovation <br />from Crossover (South of Dyer <br />Road) to Warner Avenue. <br />PROJECT CATEGORY: <br />City & Park Facility Improvements <br />Park Facility <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The City wishes to undertake improvements along the Flower Street <br />Bike Trail between Warner Avenue and the Railroad Crossover <br />(South of Dyer Road). There is damage to this section of the trail <br />caused by tree roots cracking and uplifting the surface. <br />Improvements include installation of a three-inch layer of asphalt, <br />tree root maintenance, new pedestrian fighting, and signage and <br />striping. <br />F <br />OJECT NEED: <br />o usage and time, the Flower Street Bike Trail has become very <br />en due to tree root growth and pot holes. The trail needs to be <br />faced. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 497,925 - - - - - - <br />TOTAL 497,925 - - <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />A & D District 3 497,925 - - - - - - <br />TOTAL 497,925 - - - - - - <br />DIVISION: <br />CIP Engineering <br />CONTACT: <br />Sean Thomas, Senior Civil Engineer <br />DATE: <br />10-Aug-2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.