Laserfiche WebLink
PROJECT TITLE: <br />Flower Street Bike Trail Renovation <br />from Crossover (South of Dyer <br />Road) to Warner Avenue. <br />PROJECT CATEGORY: <br />City & Park Facility Improvements <br />Park Facility <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The City wishes to undertake improvements along the Flower Street <br />Bike Trail between Warner Avenue and the Railroad Crossover <br />(South of Dyer Road). There is damage to this section of the trail <br />caused by tree roots cracking and uplifting the surface. <br />Improvements include installation of a three-inch layer of asphalt, <br />tree root maintenance, new pedestrian fighting, and signage and <br />striping. <br />F <br />OJECT NEED: <br />o usage and time, the Flower Street Bike Trail has become very <br />en due to tree root growth and pot holes. The trail needs to be <br />faced. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 497,925 - - - - - - <br />TOTAL 497,925 - - <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />A & D District 3 497,925 - - - - - - <br />TOTAL 497,925 - - - - - - <br />DIVISION: <br />CIP Engineering <br />CONTACT: <br />Sean Thomas, Senior Civil Engineer <br />DATE: <br />10-Aug-2022 <br />