My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Well No. 29 Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
09/20/2022 Special and Regular
>
Item 12 - Well No. 29 Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 9:07:52 AM
Creation date
8/14/2023 2:32:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
9/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-6491 <br />WELL NO.29 EMPROVEMENTS <br />WELL REHADILITAION <br />SCHEDULE A <br />Item <br />Description <br />Qty <br />Unit <br />'Unit Price <br />Amount <br />8 <br />Perform mechanical <br />90 <br />HRS <br />$ <br />$ <br />redevelopment (airlifting and <br />swabbing) of the well. <br />fj <br />9 <br />Conduct treatment and proper <br />1 <br />LS <br />$ <br />$ <br />discharge of mechanical and/or <br />pumping redevelopment fluids <br />(as applicable) via use of Balser <br />tanks and the neutralization, <br />blending, and disposal of <br />solids/sludges per specifications, <br />including treatment, sampling, <br />analysis and reporting for <br />NP➢ES discharge compliance. <br />10 <br />Mobilize, install and demobilize <br />I <br />LS <br />$ � � <br />$ � �� �. <br />a diesel or gasoline engine, <br />L k / <br />i <br />temporary test pump, and all <br />necessary equipment and <br />accessories <br />11 <br />Perform pumping development <br />60 <br />BRS <br />$ . <br />$ <br />of the well including monitoring <br />Ct �t <br />of water Ievels, flow rates and <br />1 <br />measurement of sand content. <br />12A & 12B <br />Perform a 12-hour (maximum) <br />60 <br />BRS <br />$ <br />$ <br />step drawdown test and a <br />minimum 24-hour (maximum. <br />t} <br />48 hour) constant rate pumping <br />test, including monitoring of <br />water levels, pumping rates, and <br />sand content. <br />13 <br />Peaforin flow meter (spinner) <br />survey under dynamic (pumping) <br />I <br />LS <br />$ <br />2 2 • <br />$ <br />`;) d 2 29) <br />conditions <br />14 <br />Conduct well disinfection and <br />I <br />LS <br />$ <br />$ , <br />clean up site, <br />1 <br />SCHEDULE A SUBTOTAL <br />$ V f `s <br />WELL EQUIPPING AND SITE IMPROVEMENTS <br />SCHEDULE B <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Mobilization, Bonds and <br />I <br />LS <br />Insurance <br />2 <br />Additional Demobilization/ <br />1 <br />I,S <br />$ <br />$ <br />Remobilization for Owner's'' <br />�=, <br />C} <br />Convenience <br />P-2 of P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.