My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Well No. 29 Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
09/20/2022 Special and Regular
>
Item 12 - Well No. 29 Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 9:07:52 AM
Creation date
8/14/2023 2:32:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
9/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-6491 <br />WELL NO.29 IMPROVEMENTS <br />WELL EQUIPPING AND SITE MPROVEMENTS <br />SCHEDULE B <br />Item <br />Description <br />Qty <br />Unit <br />UnitPirice <br />Amount <br />22 <br />Double -Leaf Motorized Swing <br />Vehicle Gate <br />I <br />EA <br />$ <br />$ <br />I I <br />Irrigation23 System and <br />1 <br />LS <br />$ 1 r. �f � � � <br />'-'t <br />$ <br />fir -7 <br />Lndscap <br />24 <br />90-Day Maintenance Contract for <br />Landscape Plants <br />I <br />LS <br />$ n <br />Z-1 �m <br />$ <br />' <br />Z <br />i <br />25 <br />Connect to Existing Piping <br />1 <br />LS <br />$- <br />(� <br />$ <br />26 <br />Yard Piping and Fittings <br />1 <br />LS <br />$ <br />M� L <br />$ , <br />2-Ci Q, `T 3 <br />27 <br />Cement -Mortar Lined and <br />Coated Steel Pipe <br />612 <br />LF <br />$ <br />g � 2-Z1. <br />$ �g <br />d <br />. j <br />23 <br />Butterfly Valves <br />3 <br />EA <br />$ <br />$ cc <br />29 <br />Check Valves <br />I <br />EA <br />$ � COO' 2.2 t CSC • - <br />2^1 0G, <br />30 <br />Magnetic Flow Meters <br />1 <br />EA <br />$ cc) <br />$ <br />co <br />31 <br />Diaphragm Valves <br />2 <br />EA <br />$ <br />$ <br />32 <br />Vertical Turbine Water Pumps <br />Motors <br />1 <br />EA <br />$ y <br />,1 t <br />$ <br />and <br />;) <br />33 <br />Excavation Safety Measures <br />1 <br />LS <br />$ <br />$ <br />34 <br />OCTA Bus Station <br />1 <br />LS <br />$ <br />$ <br />35 <br />Electronic Marquees <br />1 <br />LS <br />$ <br />ckk_ <br />$ <br />4 V D/ no(_) <br />36 <br />As -Built Plans <br />1 <br />LS <br />$ <br />$ <br />37 <br />Construction Permit <br />1 <br />LS <br />$z s,0oo <br />Al <br />Allowance for Reimbursement <br />for SCE Power Service and <br />1 <br />LS <br />$ <br />) ooc) <br />$ <br />01000 <br />Transformer <br />SCHEDULE B SUBTOTAL <br />$ ,7,f ( 0 <br />BASE BID (SCHEDULE A+ SCHEDULE B) <br />$ '_5 -2 <br />P-4 of P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.