My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Well No. 29 Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
09/20/2022 Special and Regular
>
Item 12 - Well No. 29 Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 9:07:52 AM
Creation date
8/14/2023 2:32:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
9/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Well No. 29 - Improvements <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Municipal Facilities <br />LOCATION MAP <br />N <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will rebuild components of the existing Well No. 29 <br />damaged by a vehicular accident. The project will include making <br />well site improvements such as a secure perimeter wall, well house <br />and associated electrical and piping components. <br />PROJECT NEED: <br />This well site was damaged by a vehicular accident and is currently <br />non -operable. Improvements to the electrical, disinfection treatment <br />train, and piping components are necessary to return this asset to <br />service. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24125 FY 25/26 FY 26/27 FY 27/28 FY 28129 <br />Construction 2,502,327 - - - - - - <br />Engineering - <br />TOTAL 2,502,327 - - <br />SOURCE OF FUNDS FY 22123 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />WATER CAPITAL 2,502,327 - - - - - - <br />TOTAL 2,502,327 - - - - - - <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Water Resources Armando Fernandez, Senior Civil Engineer 21-Jul-2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.