My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Construction of a Santa Ana Zoo Educational Hub and Installation of Playground at Thornton Park
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
09/06/2022 Special and Regular & HA & Special SA
>
Item 14 - Construction of a Santa Ana Zoo Educational Hub and Installation of Playground at Thornton Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 3:04:50 PM
Creation date
8/14/2023 3:04:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
9/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />“George Upton All Access Park” is a 1-acre site within Carl Thornton <br />Park. One of the main components is the barrier free playground, <br />designed to be not only fully accessible to disabled users, but in a <br />way where all users, regardless of ability, can play side by side. <br />PROJECT NEED: <br />The original installation is now 30 years old, and the equipment is <br />failing. Replacement parts are unavailable. Many of the customized <br />features are deteriorating. This project will fully replace all playground <br />equipment, built-in site play elements, interconnecting ramps and <br />walkways, and rubber surfacing areas. <br />PROJECT TITLE: <br />George Upton All Access <br />Playground at Thornton Park <br />PROJECT CATEGORY: <br />City & Park Facility Improvements <br />Facility <br />LOCATION MAP <br />AGENCY:DIVISION:DATE: <br />Parks, Rec. & Community Services Administration <br />CONTACT: <br />PRCSA Staff 16-Aug-2022 <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Design Engineering 230,250 ------ <br />Construction Engineering 230,250 ------ <br />Construction 1,769,750 ------ <br />TOTAL 2,230,250 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />2,000,000 ------CA RESOURCES AGENCY <br />GRANT <br />CANNABIS PUBLIC BENEFIT 230,250 ------ <br />TOTAL 2,230,250 ------ <br />Exhibit 2
The URL can be used to link to this page
Your browser does not support the video tag.