My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Safe Mobility Santa Ana Planning and Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 13 - Safe Mobility Santa Ana Planning and Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 3:16:06 PM
Creation date
8/14/2023 3:15:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
8/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/pw <br />Item # 13 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br /> Staff Report <br />August 2, 2022 <br />TOPIC: Safe Mobility Santa Ana Planning and Engineering Services <br />AGENDA TITLE <br />Approve an Agreement with KTUA for Traffic Planning and Engineering Services for the <br />Safe Mobility Santa Ana Plan Update in the Amount of $180,000 for a up to a Five-year <br />Term (Non-General Fund) <br />RECOMMENDED ACTION <br />Authorize the City Manager to execute an agreement with KTUA, for transportation/traffic <br />planning and engineering services for the Safe Mobility Santa Ana (SMSA) plan update, <br />for a three-year period beginning August 2, 2022, and ending on August 1, 2025, with the <br />option to extend for up to a two-year period, in a total aggregate amount not to exceed <br />$180,000, subject to non-substantive changes approved by the City Manager and City <br />Attorney. <br />DISCUSSION <br />On August 30, 2021, the Public Works Agency issued a Request for Proposal (RFP) for <br />contractors to provide transportation/traffic planning and engineering services to update <br />the existing Safe Mobility Santa Ana (SMSA) plan (Exhibit 1). The goal of the SMSA <br />update is to reevaluate citywide traffic safety, identify new areas of concern, contributing <br />factors and patterns, recommend and prioritize improvements, and analyze traffic <br />collisions of pedestrians and bicyclists, to reduce the number of persons killed or injured <br />in collisions. <br />The RFP was advertised on the City’s online bid management and publication system, <br />with bids due on September 20, 2021. Six proposals were received and evaluated by a <br />three-member panel of Public Works Agency Staff selection. The scores were based on <br />criteria as outlined in the RFP. Listed below are the responding contractors and their <br />ranking: <br />Rank Firm Average Score Location <br />1 KTUA 95 San Diego <br />2 NN Engineering, Inc.92 San Francisco <br />3 Toole Design 91 Los Angeles <br />4 IBI Group 87 Irvine
The URL can be used to link to this page
Your browser does not support the video tag.