My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Safe Mobility Santa Ana Planning and Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 13 - Safe Mobility Santa Ana Planning and Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 3:16:06 PM
Creation date
8/14/2023 3:15:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
8/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT 10-HJ COST PROPOSAL Page 1 of 2 <br />COST PER UNIT OF WORK CONTRACTS <br />(GEOTECHNICAL AND MATERIAL TESTING) <br />Note: Mark-ups are Not Allowed □ Prime Consultant □ Subconsultant □ 2nd Tier Subconsultant <br />Consultant __________________ _ <br />Project No. _________ _ Contract No. ---------Date ------- <br />Unit/Item of Work: <br />(Example: Log of Test Boring for Soils Report, or ADL Testing for Hazardous Waste Material <br />Study} Include as many Items as necessary. <br />DIRECT LABOR Hours Billing Hourly Rate {$) Total{$) <br />Professional {Classification)* <br />Sub-professional/Technical** <br />EQUIPMENT 1 {with Operator) <br />EQUIPMENT 2 {with Operator) <br />Consultant's Other Direct Costs (ODC)-Itemize: <br />Description of Item Quantity Unit Unit Cost Total <br />Subconsultant 1: <br />Subconsultant 2: <br />Subconsultant 3: <br />Subconsultant 4: <br />Subconsultant 5: <br />Nole: Attach addtllonal pages if necessary. <br />TOTAL COST PER UNIT OF WORK <br />NOTES: <br />1 . Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements <br />must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. The cost proposal format shall not be amended. <br />2. Hourly billing rates should include prevailing wage rates and be consistent with publicly advertised rates charged to <br />all clients (Commercial, Private or Public). 3. Mobilization/De-mobilization is based on site location and number and frequency of tests/items. <br />4. ODC items shall be based on actual costs and supported by historical data and other documentation. 5. ODC items that would be considered "tools of the trade' are not reimbursable. <br />6. Billing Hourly Rates must be actual, allowable, and reasonable. <br />EXHIBIT 1 <br />Mileage Costs 2 1 $ 10.00 <br />Equipment Rental and Supplies 2 $ 20.00 <br />Permit Fees 3 $ 30.00 <br />Plan Sheets <br />Test <br />$ 100.00 <br />$ 200.00 <br />$ 300.00 <br />$ 500.00 <br />4 4 4
The URL can be used to link to this page
Your browser does not support the video tag.