Laserfiche WebLink
9 <br />Pitch Concept <br />The 5-a-side artificial turf football pitch is ideal for locations where <br />communities have limited space to be active,participate in <br />programmes,and enjoy the game.As a standard,a 40x20m <br />space with buffer parameters is required;but considerations are <br />made if the identified land size differs. <br />The infrastructure project involves multiple stakeholders <br />collaborating to realise and complete the Lay’s RePlay pitch.On <br />average,each project may take up to 8 months for completion, <br />with the bulk of the time invested in securing land permits and <br />fostering relationships with landowners (usually the government). <br />During this period,the proper infrastructure plans are already in <br />the making;including the development of technical specifications <br />and required materials,close coordination with the community,its <br />role and engagement around the pitch before,during,and after <br />completion of the construction.In parallel,chips packs collection <br />campaigns are coordinated by the Local PepsiCo branches in <br />different countries. <br />After the design process,technical details definition,and securing <br />land and construction permits,the construction process begins. <br />Exhibit 1