Laserfiche WebLink
Page 2 of 10 <br />#210221v1 <br />3)Installation of the Pitch, LED lighting, fencing and the support of the RePlay partners <br />through this Grant Agreement shall have a value equivalent to approximately one <br />hundred and fifty thousand dollars ($150,000.00). The grant is funded by Frito-Lay <br />Trading Company and UEFA Foundation for children. <br />4)City shall not pay any amount for installation of the Pitch. <br />5)Pitch will be in a location at the Park designated by City that is a minimum of 30 meters <br />x 20 meters. Pitch specifications are outlined generally in the Lay’s RePlay Handbook <br />2021 attached hereto as Exhibit A. The estimated site plan overview is outlined in <br />Exhibit B. <br />6)Pitch will consist of a five-sided community soccer field. <br />7)Grantor shall ensure that installation of Pitch conforms to all applicable federal, state <br />and local law. <br />8)Grantor shall ensure that RePlay partners and/or any subcontractors installing the Pitch <br />shall obtain all required permits and approvals. <br />9)Grantor shall ensure that RePlay partners and/or any subcontractors installing the Pitch <br />shall comply with all applicable building codes. <br />10)Once Pitch is installed City commits for a period of ten (10) years from the date of <br />completion of installation to make Pitch available on mutually agreeable dates and time <br />as part of the implementation and programming run by PureGame, an Orange County <br />non-profit youth sports organization. In the event that PureGame is no longer in <br />existence or otherwise unable to provide programming for the Pitch, City commits to <br />work with another mutually agreeable local non-profit organization that conducts youth <br />sports programming. Programming by PureGame or any other local non-profit <br />organization for the Pitch will be subject to a separate agreement between the City and <br />PureGame or other non-profit. <br />11)Upon completion of installation, Pitch will be maintained in accordance with its <br />vendor’s recommendations for user safety. <br />12)Upon completion of installation, payment of all subcontractors and acceptance of Pitch <br />by City, City will become responsible for the continued maintenance of Pitch. <br />C.Branding of Football Pitch <br />1)Branding set forth in this subsection will be required for a period of ten (10) years from the <br />date of completion of installation. <br />2)City agrees to allow certain specified branding elements to remain permanently affixed to <br />the Pitch. These branding elements include on turf branding consisting of a center circle <br />with the Lay’s logo and a rectangular UEFA Foundation for children logo. <br />3)City agrees to allow for the installation of four (4) fixed boards at the entrance to the Pitch. <br />4)City agrees that side panels and rebound walls of the Pitch will be branded with the logos <br />of streetfootballworld, Lay’s RePlay, and/or UEFA Foundation for children. <br />5)The branding is outlined generally in the Lay’s RePlay Handbook 2021 attached hereto as <br />Exhibit A. <br />6)Grantor and/or Lay’s RePlay partners or subcontractors shall obtain all necessary permits <br />and approvals for signage containing branding. <br />7)Grantor and/or Lay’s RePlay partners may remove any branding required by this <br />subsection at any time and for any reason during the Agreement. <br />Exhibit 1