My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 31 - First Extension of Entitlements for the Central Pointe Mixed -Use Development: 1801 East Fourth Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
07/19/2022 Special and Regular & Special HA
>
Item 31 - First Extension of Entitlements for the Central Pointe Mixed -Use Development: 1801 East Fourth Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 11:14:35 AM
Creation date
8/14/2023 4:00:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
31
Date
7/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRESIDE <br />• see sheet L.8 <br />EVA GATES <br />DINNER PARTY <br />• see sheet L.8 <br />HppH N <br />LN <br />�'i;► K)Hill unk-Alhil <br />• � �i���i'i"�ii �p - � :� �I�lily L 1ti,�� .,i;�gil�il�il <br />NEW MASONRY SOUND <br />WALL <br />BUILDING B ROOFTOP <br />Is see sheet L.5 <br />GAME PROMENADE <br />• corn hole <br />• ping pong <br />• sculptural benches <br />• picnic tables <br />• boulders <br />THE HANGOUT <br />• see sheet L.7 <br />F NJ <br />J <br />y CLUBROO� <br />2 � ; <br />cs O --- <br />♦ i� <br />O \ L - <br />L <br />V Tlo i <br />r <br />EVA GATES 00`c <br />*STREET TREES TO BE INSTALLED AS 24" BOX SIZE PER THE <br />CITY STANDARDS & APPROVED PLAN, AS NEEDED <br />• STREET TREES TO BE 35' O.C. ALONG THE PROJECT <br />FRONTAGE, INCLUDING DEEP ROOT IRRIGATION SYSTEMS, PER <br />CITY STANDARDS. CONTACT THE TREE SECTION SUPERVISOR <br />(714)647-3337 FOR TREE SPECIES & FOR NUMBER AND SIZE OF <br />REQUIRED TREES REPLACEMENTS <br />L A N D S C A P E <br />ARCH ITECTURE <br />WATERFORD <br />Pit0 P EIll V cnsLp,ti,I <br />i <br />CENTRAL POINTE <br />SANTA ANA, CA <br />S <br />P A R K C 0 U R T PLACE <br />30 O.C. <br />------------ _j <br />- <br />a�luIVIW ----- ` kI <br />4 T H STREET <br />CONCEPTUAL DESIGN <br />JULY 20TH, 2020 <br />BUILDING A <br />FITNESS <br />CLUBROOM <br />THE BACKYARD <br />• see sheet L.6 <br />GREAT LAWN PARK <br />• see sheet L.2 <br />PUBLIC PLAZA <br />• see sheet L.6 <br />BUILDING A ROOFTOP <br />• see sheet L.4 <br />110 <br />PUBLIC PLAZA <br />• see sheet L.6 <br />ALE:1"= I30' CONCEPT LANDSCAPE PLAN <br />II I I <br />0' 15' 30' 60' <br />RIDE SHARE PICKUP <br />ENTERTAINMENT GARDEN <br />Is see sheet L.7 <br />ACTIVATED CORNER PLAZA <br />Is see sheet L.3 <br />RETAIL PLAZA <br />• outdoor dining <br />• pottery <br />• specimen tree <br />L 0 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.