Laserfiche WebLink
EXHIBIT 4 <br />COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 21-2744: Santa Ana Zoo Goat Trail <br />Construction Contract <br />$ <br />400,000.00 <br />Contract Administration, Inspection and Testing <br />$ <br />80,000.00 <br />Contingencies <br />$ <br />80,000.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />560,000.00 <br />