My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Stormwater Channel Fencing Upgrades Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 16 - Stormwater Channel Fencing Upgrades Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 11:57:44 AM
Creation date
8/14/2023 5:00:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 22-6469: Stormwater Channel Fencing <br />Upgrades <br />Construction Contract <br />$ <br />415,965.00 <br />Contract Administration, Inspection and Testing <br />$ <br />24,035.00 <br />Contingencies <br />$ <br />40,000.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />480,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.