My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 05 - Crossroads at Washington Affordable Housing Project at 1126, 1136, & 1146 East Washington Ave.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 05 - Crossroads at Washington Affordable Housing Project at 1126, 1136, & 1146 East Washington Ave.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 8:53:35 AM
Creation date
8/15/2023 8:53:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
5
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Crossroads at Washington Affordable Housing Project at 1126, 1136, & 1146 East <br />Washington Avenue <br />June 21, 2022 <br />Page 9 <br />2 <br />8 <br />1 <br />5 <br />ownership of the adjacent properties located at 1126 and 1146 E Washington Avenue. At <br />that same meeting, City Council also authorized the Executive Director of the Housing <br />Authority to execute a joint sixty- five (65) year Ground Lease and an Option Agreement <br />with Washington Santa Ana Housing Partners, L. P., a California limited partnership <br />formed by the Developer. The Staff Report from February 18, 2020, is attached as Exhibit <br />10. <br />Since that date and during the option term, the Developer conducted a site assessment <br />of the Project area and identified a number of unexpected environmental contaminants. <br />This issue was communicated to City Council on December 15, 2020 and August 17, <br />2021. To summarize the environmental contamination issue, the Developer retained <br />Altec Testing & Engineering, Inc. (“Altec”) during their due diligence period to conduct <br />environmental investigations for the sites. An initial Phase I environmental investigation <br />was conducted on October 19, 2019. A Phase II Environmental Site Assessment (“Phase <br />II”) Report was warranted based on the Phase I findings and was prepared by Altec on <br />February 19, 2020. The Phase II identified unexpected contaminants and recommended <br />additional environmental investigations to determine the extent of the soil contamination <br />on the County and Housing Authority-owned properties. In addition, the County retained <br />Geosyntec Consultants, Inc. to provide environmental peer review services and to act as <br />the County’s consultant with respect to environmental issues on the property (the City <br />retained services from a City consultant only as needed). Thereafter, and following <br />approval by the Board of Supervisor on August 21, 2021, the County entered into a <br />voluntary oversight agreement with the State of California Department of Toxic <br />Substances Control (“DTSC”) that authorized DTSC to serve as the oversight agency for <br />the Project. The Agreement allowed DTSC the ability to facilitate and help coordinate <br />further inspections and investigations, review and approve appropriate remediation <br />measures and documents, and engage the public, as necessary. <br />Since the Developer did not contribute to the existing on-site environmental contaminants, <br />the Developer has requested to amend the indemnity obligations in the Ground Lease to <br />reflect the preexisting condition of the property related to the existing contaminants. As a <br />result, the County and the Housing Authority staff have negotiated a revised Ground <br />Lease to eliminate the Developer’s indemnity obligations associated only with these <br />existing hazardous materials in Section 4.4.4 of the Ground Lease, but to maintain all <br />prior indemnity provisions. With the DTSC approved remediation plan, this should not <br />result in any additional obligations or liability to the Housing Authority or City. <br />In addition, U.S. Bank as the senior lender for the Project, requested revisions to the <br />Ground Lease as part of their due diligence in order to approve their senior loan. In <br />general, U.S. Bank’s revisions seek to protect and enhance their rights as a senior lender. <br />Specifically, U.S. Bank requested revisions throughout the Ground Lease in the following <br />Sections: Annual Operating Expenses, Effective Date, Net Refinancing Proceeds, Net <br />Syndication Proceeds, Preconditions, Ownership of Improvements, contributions to the
The URL can be used to link to this page
Your browser does not support the video tag.