My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 34 - Workstation and Video Monitoring Upgrades
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 34 - Workstation and Video Monitoring Upgrades
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:00:55 PM
Creation date
8/15/2023 8:56:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
34
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIU010 VISUAL SYSTEM: MILESTONE SCHEDULE <br />Client: Citv of Santa Ana <br />Prepared by: Hailey Schellin <br />Date: 4/7/2022 <br />MILESTONE <br />DATE <br />1. <br />Project Awarded — Notice to Proceed <br />06/21/22 <br />2. <br />Project Team Kick Off Meeting <br />07/05/22 <br />3. <br />Engineering Team Meeting On -Site <br />07/05/22 <br />4. <br />Audio Visual Drawings <br />07/19/22 <br />5. <br />AV Equipment — Long Lead Procurement <br />07/06/22 <br />6. <br />Touch Panel Build / Prep <br />N/A <br />7. <br />AV Equipment Procurement <br />07/26/22 <br />8. <br />AV Cabling <br />08/15/22 <br />9. <br />Install Screens <br />08/22/22 <br />10. <br />On -Site Console Fabrication <br />08/29/22 <br />11. <br />Install AV Devices <br />09/01/22 <br />12. <br />AV Terminations & Wiring Devices <br />09/06/22 <br />13. <br />WAVS Equipment Set -Up & Updates <br />09/12/22 <br />14. <br />On -Site Programming <br />N/A <br />15. <br />WAVS Testing & Troubleshooting <br />09/15/22 <br />16. <br />Project Substantial Completion <br />09/16/22 <br />17. <br />Training <br />09/19/22 - 09/20/22 <br />18. <br />Audio Visual Closeouts & Documentation Delivery <br />10/06/22 <br />19. <br />Project 100% Complete <br />10/07/22 <br />PLEASE NOTE: <br />1. <br />With the consent of Western AVS & the City of Santa Ana, this schedule can be <br />adjusted. <br />2. <br />This schedule is based on Western AVS' current workload. Western AVS cannot <br />guarantee these dates until a contract or PO has been issued. <br />3. <br />This schedule is based on typical equipment lead time orders. This schedule does <br />NOT indicate any backordered equipment items. If there are equipment items that <br />are backordered, this schedule will need to be revised. <br />4. <br />This schedule does NOT include any work done by subcontractors. This schedule will <br />need to be revised based on the subcontractors lead times on equipment and install <br />schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.