Laserfiche WebLink
Derek Romer, PE Electrical Engineer/Material <br />Submittals <br />Professional Registration <br />Mr. Romer has more than 27 years of experience, including electrical and controls <br />• Electrical Engineer, <br />system design, in secondary power distribution, lighting, and instrumentation, <br />California, No. E16396 <br />as well as reservoirs, sewage lift stations, wastewater treatment plants, and <br />water treatment plants. His expertise comprises project management, field <br />Education <br />investigations, calculations, preparation of design drawings and specifications <br />• Bachelor of Science, <br />for bid packages, review of bid packages and construction shop drawings, and <br />Electrical Engineering, <br />construction management, including troubleshooting during project startup and <br />California Polytechnic <br />inspection. Mr. Romer's pump station designs feature energy -efficient systems <br />State University, San Luis <br />and promote off-peak power use. <br />Obispo, California <br />LHUD Production Well Design, Lost Hills, California: As the District Engineer, <br />Professional Affiliations <br />Cannon provided engineering design services for water wells including the <br />• Institute of Electrical and <br />ECWAG North and East Well Re -Equipping and Well No. 3 projects. For <br />Electronics Engineers <br />ECWAG, due to on -going drought conditions and a resulting 150-foot water table <br />(IEEE) <br />drop, the USDA provided a $500,000 emergency grant for upgrading and re - <br />equipping these two existing wells. Cannon provided preliminary design, project <br />• National Fire Protection <br />coordination, and construction oversight. For Well No. 3, Cannon completed a <br />Association <br />new well design with vertical turbine pumps and a VFD motor drive. <br />• Southern California Water <br />Water Well Design WT0025, Tulare, California: The City of Tulare was diligently <br />Utilities Association <br />pursuing improvements to the City's water system including the construction of <br />(SCWUA) <br />five new wells throughout the City. The City had upgraded or repaired existing <br />• National Council of <br />wells to increase efficiency but had not constructed a new well since 2009. <br />Examiners for Engineers <br />The City selected Cannon provided design and engineering for all five wells. <br />and Surveyors (NCEES) <br />Cannon scope of services included engineering design for site improvements; <br />equipping each new well with oil -lubricated vertical turbine pumps and motors <br />Office Location <br />with removable enclosures; propeller meters; variable frequency drive controls; <br />• Los Angeles, California <br />underground flush to waste basins; and transfer switches with connection points <br />for newly purchased generators. <br />Select Project Experience Summary <br />Mr. Romer serviced as electrical engineer on th <br />projects: <br />• Construction Management and Inspection <br />for Well No. 2, Crescenta Valley Water Distr <br />Crescenta, California <br />• Groves Booster Pump Station, Golden Stat( <br />Water Company, Orcutt, California <br />• Electrical Engineering Design Services for <br />Plant 408, Suburban Water Systems, Covin <br />California <br />• Lost Hills Utility District New Water Well <br />Coordination and Construction Managemer <br />Lost Hills, California <br />• Design and Construction Management for <br />Well No. 16, Crescenta Valley Water District <br />Montrose, California <br />