Laserfiche WebLink
Toby Turnage, PE Designer/Mechanical <br />Inspector/Material Submittals <br />Professional Registration Mr. Turnage is an Engineer and experienced Project Manager with <br />• Mechanical Engineer, comprehensive knowledge of mechanical engineering and its application <br />California, No. 41800 in areas such as hydraulic turbines, pumps and motors, and governor <br />systems. He is adept at working with clients to develop a technical scope <br />Education of work with strict scheduling and budgeting efficiency, working with <br />• Bachelor of Science, multidisciplinary teams, and retaining excellent administrative capabilities. <br />Mechanical Engineering, He is skilled in reviewing and analyzing data from field representatives, <br />Colorado School of Mines, customers, and/or as -built drawings and providing additional technical <br />Golden, Colorado recommendations or solutions. Additionally, Mr. Turnage is proficient <br />• University of Colorado- with extensive problem solving and statistical data analysis using such <br />Denver Graduate Degree programs as: MS Project, Pro-E, Solid Edge v. 12, WHAMO, Matlab v.6, <br />Program Courses in Labview, Mathcad Professional, Bentley STAAD Pro AutoCAD 2011, <br />Turbomachinery (2006); PowerPoint, MS Word, Microsoft Excel, and Sharepoint. <br />Inelastic and Elastic Stress Well 31 Tank Replacement, Simi Valley, California: The District operates <br />Analysis (2007) Well 31, which supplies the City's 1 MGD Treatment Plant. The well site <br />is equipped with a bolted galvanized steel tank. The tank serves to set <br />Professional Affiliations a positive hydraulic gradient upstream of the pressure reducing valve <br />• ASME) American Society supplying the Treatment Plant. The City had planned to replace the old and <br />of Mechanical Engineers, corroded tank. Cannon investigated the tank and concluded the condition <br />Advisory Board to the Chair of the tank at Well Site 31 required more immediate attention than the tank <br />— Colorado Section at Well Site 32 and needed replacement in -kind with the same existing <br />volume. Cannon provided the topographic survey of the site and a 3D scan <br />off Tank Site 31, coordinated with the tank manufacturer for the design of <br />the steel tank, provided design for the foundation and connections of the <br />tanks to the foundation, and provided the existing piping and drainage <br />information to the tank manufacturer to reduce modifications. Mr. Turnage <br />provided mechanical engineering services for this <br />project. <br />Summary of Select Project Experience <br />Mr. Turnage served as mechanical engineer on the <br />following projects: <br />• Electrical Engineering Design Services for <br />Plant 408, Suburban Water Systems, <br />Covina, California rf <br />• Pinewood Plant Reservoir and Booster � •' <br />:1 <br />Pump Station, Golden State Water <br />Company, Tanglewood (Orcutt),� 1 <br />California ' ' ' <br />