Laserfiche WebLink
Esther Lopez <br />Office Engineer/Alternate Construction <br />Administration <br />Education Ms. Lopez demonstrates effective teamwork, communication, and <br />• Bachelor of Science, Civil management. She prepares project reports and reviews and references <br />Engineering, California drawings. She has conducted rebar inspection, concrete inspection, and <br />Polytechnic University, San compaction inspections. Ms. Lopez has experience analyzing and compiling <br />Luis Obispo, California pay applications and change orders, she has transferred RFIs and submittals <br />to database platforms for project team and client accessibility. <br />Software Skills <br />• Bluebeam Revu Extreme <br />Construction Management for Hwy 46 East Water Main Relocations, <br />Lost Hill Utility District (LHUD), Lost Hills, California: The widening <br />• Auto CAD <br />of Caltrans Highway 46, at the interchange with Interstate 5, required the <br />• Adobe Acrobat <br />relocation of several LHUD pipeline segments, out of Caltrans right-of-way. <br />• Microsoft Suite <br />The pipeline relocations consisted of moving approximately 2,100 linear feet <br />of 12-inch C900 PVC pipe and approximately 550 linear feet of 8-inch C900 <br />• Impact <br />PVC pipe. Two segments of the pipe were constructed using trenchless <br />technology, specifically horizontal directional drilling (HDD). Cannon <br />successfully provided construction management and Inspection services, <br />including construction staking; materials testing and sampling; Caltrans <br />coordination; administration of Caltrans/LHUD agreement; and storm water <br />monitoring. Ms. Lopez served as Office Engineer. <br />Construction Management for Pismo Streetscape: Shell Beach Road, <br />Pismo Beach, California: This project involved the construction of a multi- <br />use path placed along the east side of Shell Beach Road, along the Caltrans <br />right-of-way boundary, to connect the Shell Beach Elementary School to <br />Dinosaur Caves Park. In addition, several other surface enhancements were <br />needed, including ADA-compliant sidewalks and curb ramps, intersection <br />bulb -outs for pedestrian safety and traffic calming, landscaping, streetscape <br />furnishings and amenities, lighting, walls and <br />fences, fresh pavement surfaces, new striping and <br />markings, and public art displays. The City retained <br />Cannon to provide construction management, <br />inspection, materials testing, and administrative <br />services. Ms. Lopez served as Office Engineer. <br />Select Project Experience <br />Summary <br />Ms. Lopez has served as Office Engineer/ <br />Document Control on the following projects: <br />Construction Management Services for <br />Main West Tank, Paso Robles, California <br />• Construction Management Services for <br />S. River Rd Sewer Abandonment and Lift <br />Station No.8 Force Main Extension, Paso <br />Robles, California <br />L Cannon A-10..4 <br />