My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 56 - 2022-23 Fiscal Year SB 1 Local Streets and Roads Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 56 - 2022-23 Fiscal Year SB 1 Local Streets and Roads Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 9:45:04 AM
Creation date
8/15/2023 9:45:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
56
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Design and construction of pedestrian safety improvements <br />including sidewalk widening, protected pedestrian crossings and <br />ADA upgrades. Reconstruction/resurfacing of existing pavement <br />and replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />PROJECT NEED: <br />This project is designed to increase pedestrian safety and mobility <br />along the corridor. The City's Pavement Management Program (PMP) <br />has been developed to prioritize and recommend the most cost- <br />effective roadway repairs, and maximize the return from available <br />funding for street pavement. This segment of 1st Street pavement <br />rehabilitation is identified as a high priority in the PMP. <br />PROJECT TITLE: <br />1st Street Pedestrian Improvements <br />and Rehabilitation from Flower to <br />Standard Avenue <br />PROJECT CATEGORY: <br />Street Improvements <br />Curb, Gutter, Sidewalk <br />Improvements <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 14-Apr-2022 <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 1,150,000 ------ <br />TOTAL 1,150,000 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />RMRA SB1 1,150,000 ------ <br />TOTAL 1,150,000 ------
The URL can be used to link to this page
Your browser does not support the video tag.