Laserfiche WebLink
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Design and construction of pedestrian safety improvements <br />including sidewalk widening, protected pedestrian crossings and <br />ADA upgrades. Reconstruction/resurfacing of existing pavement <br />and replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />PROJECT NEED: <br />This project is designed to increase pedestrian safety and mobility <br />along the corridor. The City's Pavement Management Program (PMP) <br />has been developed to prioritize and recommend the most cost- <br />effective roadway repairs, and maximize the return from available <br />funding for street pavement. This segment of 1st Street pavement <br />rehabilitation is identified as a high priority in the PMP. <br />PROJECT TITLE: <br />1st Street Pedestrian Improvements <br />and Rehabilitation from Flower to <br />Standard Avenue <br />PROJECT CATEGORY: <br />Street Improvements <br />Curb, Gutter, Sidewalk <br />Improvements <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 14-Apr-2022 <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 1,150,000 ------ <br />TOTAL 1,150,000 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />RMRA SB1 1,150,000 ------ <br />TOTAL 1,150,000 ------