My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 57 - Measure M2 Funding Eligibility 2022 Renewal
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 57 - Measure M2 Funding Eligibility 2022 Renewal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 9:45:13 AM
Creation date
8/15/2023 9:45:12 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
57
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Resolution No. 2022-XXX <br />Page 1 of 2 <br /> <br /> <br />RESOLUTION NO. 2022-XXX <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY <br />OF SANTA ANA CONCERNING THE STATUS AND <br />UPDATE OF THE PAVEMENT MANAGEMENT PLAN <br />FOR THE MEASURE M2 PROGRAM <br /> <br /> <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS <br />FOLLOWS: <br /> <br /> Section 1. The City Council of the City of Santa Ana hereby finds, determines <br />and declares as follows: <br /> <br /> A. The City of Santa Ana is required to meet eligibility requirements and <br />submit eligibility verification packages to the Orange County Transportation Authority <br />(“OCTA”) in order to remain eligible to receive Measure M2 funds. <br /> <br /> B. On a biennial basis, the City of Santa Ana is required to adopt and <br />update a Pavement Management Plan (“PMP”), using the required format, regarding <br />the status of road pavement conditions and implementation of the PMP. <br /> <br /> C. The City of Santa Ana is required to provide a plan that manages the <br />preservation, rehabilitation, and maintenance of paved roads by analyzing pavement <br />life cycles, assessing overall system performance costs, and determining alternative <br />strategies and costs necessary to improve paved roads. <br /> <br /> Section 2. The City Council hereby declares that the PMP is in conformance <br />with the PMP Submittal Template provided in the Countywide Pavement Management <br />Plan Guidelines. <br /> <br />Section 3. The City of Santa Ana hereby adopts a PMP and has provided an <br />updated PMP report, using the required format, to OCTA. <br /> <br /> Section 4. The City Council authorizes the Executive Director of the Public <br />Works Agency, the City Engineer, or his or her designee to sign the PMP certification <br />form. <br /> <br />Section 5. This Resolution shall take effect immediately upon its adoption by <br />the City Council, and the Clerk of the Council shall attest to and certify the vote <br />adopting this Resolution. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.