Laserfiche WebLink
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />Tom <br />Project Manager <br />B.S. <br />200 miles <br />• <br />Mesa Wells Pipeline <br />Epperson <br />Irvine Office <br />Environmental <br />41 <br />RCE No. 36399 <br />o <br />10 /0 <br />20 PRS <br />• <br />Mid -Basin Injection Wells/Pipe <br />PM <br />Engineering <br />• <br />Anaheim Katella and PRS <br />• <br />All City of Santa Ana Projects <br />• <br />Anaheim PRS <br />Neha Gajjar <br />Assistant PM <br />B.S. Civil <br />29 <br />RCE No. 55574 <br />o <br />20 /0 <br />55 miles <br />SA-7 and Ritchey WM Relocation <br />Assist. <br />Irvine Office <br />Engineering <br />6 PRS <br />SA Water Main Improvements <br />PM <br />• <br />SA-1 Hydro -Generator Replacement <br />PRS <br />Crown Valley ID 1 Master Meter <br />Matt Vera <br />Lead Engineer <br />B.S. Civil <br />8 <br />RCE No. 86663 <br />33% <br />10 miles <br />Well 32 Rehabilitation <br />PE <br />Irvine Office <br />Engineering <br />4 PRS <br />SA-7 Relocation <br />• <br />SA-1 Hydro -Generator Replacement <br />Pipeline <br />Crown Valley Pipeline Replacement <br />Erin <br />Lead Engineer <br />B.S. Civil <br />11 <br />RCE No. 89704 <br />o <br />33 /0 <br />55 miles <br />Mesa Wells Pipeline <br />PE <br />Cabanero <br />Irvine Office <br />Engineering <br />5 PRS <br />Mid -Basin Injection Pipelines <br />• <br />Newport Beach WM Replacements <br />MWD Coord & <br />SA-7 Relocation <br />Cory <br />Construction <br />B.S. Civil <br />20 <br />EIT No. 121854 <br />o <br />5/0 <br />15 miles <br />SA-5 Vault Modifications <br />DE <br />Heggtveit <br />Support <br />Engineering <br />8 PRS <br />San Lorenzo Construction Support <br />• <br />SA-1 Hydro -Generator Replacement <br />Electrical/ <br />All City of Santa Ana Projects <br />Mazen <br />Controls <br />B.S. Electrical <br />29 <br />EE No. 15809 <br />10% <br />10 PRS <br />MNWD ID Master Meter <br />EE <br />Kassar <br />Manager Irvine <br />Engineering <br />Mid -Basin Injection Wells <br />Office <br />Anaheim PRS <br />Structural Mgr <br />B.S. Civil <br />RCE No. 75983 <br />All City of Santa Ana Projects <br />Eric Yuen <br />San Dimas, <br />Engineering <br />14 <br />SE No. 6177 <br />5% <br />8 PRS <br />• <br />MNWD ID Master Meter <br />SE <br />Office <br />. <br />Mid -Basin Injection Wells <br />Nate <br />WQMP <br />B.S. <br />• <br />Well 32 Rehabilitation <br />Schreiner <br />Lead Engineer <br />Environmental <br />14 <br />RCE No. 74974 <br />5% <br />-- <br />• <br />Mid -Basin Injection Wells <br />PE <br />Irvine Office <br />Engineering <br />_• <br />SA-7 Relocation <br />Legend: PM <br />— Project Manager; <br />PE — Project Engineer; DE <br />— Design Engineer; EE <br />— Electrical <br />Engineer; SE — <br />Structural Engineer <br />TETRA TECH Page 14 <br />