My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No, 21-127 <br />City of Santa Ana <br />SA-2 Pressure Control Station Relocation and Transmission Main Improvements <br />ID <br />Task Name. <br />(Duration <br />(Start <br />Finish <br />IMir[h I IApnl I (May Rune (July Au ust �septemher Od96er 19 emhr oew her January �Fehruary <br />2273ffi3J13fl2L132]1413 �/1lA4/l]6245l1 585] S 2 29 6 z 1962fi]3] -] 7 33 � �81-0' 1 289-0911918925102109 ] 1 i 1Z1242 1 2 1 1 � l 11221'925 12 ] <br />1 <br />1Qck-off Meeting <br />As -Built and Utility Research <br />Survey <br />Potholing <br />i3eotechrical Investigoticn <br />Transient Analysis <br />Design Workshop- Key Design Decisions <br />Design Workshop No. 1— Key Design <br />Decisions <br />Design Workshop No. 2— Key Design <br />Decisions <br />Design Workshop No. 3— Key Ceigr <br />Decisions <br />Design Workshop No.4— Key Ceign <br />Cecisions <br />Design Workshop No. 5—Key Design <br />Decisions <br />Design Workshop No. 6— Key Design <br />Decisions <br />Design Workshop No. 7— Key Deign <br />Cecisions <br />Cesign Workshop No. 8— Key Design <br />Decisions <br />Basisof Deign and 30% Dn5ign <br />Gty Review <br />Bas'sof Deign Final Submittal <br />Draft CFQA IS/MNC <br />City Review <br />Public Review <br />Final CEQA IS/MND <br />60%Design Submittal <br />City Review <br />905".Design Submittal <br />Gty Review <br />Gty Cepartment`S Permit Review <br />Final Construction Document <br />7 days <br />39 days <br />15 days <br />20 days <br />40 days <br />39 days <br />45 days <br />:0 days <br />•0 days <br />0days <br />0 days <br />0 days <br />0 days <br />•0 days <br />0 days <br />53 days <br />11 days <br />9 days <br />43days <br />11 days <br />34days <br />15 days <br />38 days <br />11 days <br />44 days <br />26 days <br />36 days <br />29 days <br />Tue 3/1/22 -Wed 3/9/22 <br />Tue 3/1/22 Fri 4/22/22 <br />Mon 4/4/22 Fri 4122/22 <br />Mon 5/2/22 Fri 5/27/22 <br />Mon 5/2/22 Fri 6/24122 <br />Mon 6/6/22 Thu 7/28/22 <br />Wed 3/23/22 Wed 5/25/22 <br />Wed 3123/22 Wed 3123/22 <br />Wed 4/6/22 Wed 4/6/22 <br />Wed4/20/22 'Wed 4/20/22 <br />Wed 4/27/22 Wed 4/27/22 <br />Wed 5/4/22 Wed 5/4122 <br />Wed 5111122 'Wed 5/11/22 <br />Wed 5/18/22 Wed 5/18/22 <br />Wed 5/25/22 -Wed 5/25/22 <br />Mon 5J2/22 -Wed 7/13/2� <br />Thu 7/14122 Thu 7128/22 <br />Fri 7129122 Wed 8/30/22 <br />Mon6/6/22 WedS/3J22 <br />Thu S/4/22 Thu 8/18/22 <br />Fri8119/22 'Wed 10/5/22 <br />Thu 1016122 Wed 10/26/22 <br />Mon 8/1/22 Wed 9/21/22 <br />Thu 9/22122 Thu 20/6122 <br />Fri 10/7/22 Wed 12/7/22 <br />Thu 1218/22 Thu 1112123 <br />Thu 12/8/22 Thu 112612S <br />Fri 1113123 Wed 2/22/23 <br />! 3/23 <br />i 4/6 <br />#4/2 <br />1127 <br /># 514 <br />5111 <br />♦ 5/19 <br />4 512 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />H <br />5 <br />1p <br />11 <br />•72 <br />13 <br />1A <br />15 <br />tfi <br />17 <br />15 <br />18 <br />r <br />21 <br />22 <br />29 <br />24 <br />25 <br />26 <br />27 <br />29 <br />TETRA TECH Page 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.