My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />Mid -Basin Injection Centennial Park Project I Orange County Water District <br />,1 011HU1, _ . J10-Jf 1 1 .,.,,.......v............... <br />The Mid -Basin Injection Centennial <br />Park Project is located within <br />Centennial Park in the City of <br />Santa Ana. Four injection wells <br />constructed in below ground vaults <br />are proposed to inject 12 mgd of <br />Groundwater Replenishment <br />System water into the principal <br />groundwater aquifer approximately <br />1,200 feet below ground surface. <br />The project consists of the <br />following: <br />Four (4) submersible backflush <br />pumps will be installed within <br />the injection wells with a design <br />flowrate of 3,000 gpm to purge <br />the entire well column and <br />surrounding strata. <br />Each of the four injection wells <br />will require a pipeline <br />connection to deliver the supply <br />water for injection. The source of water for these wells will be the Groundwater Replenishment <br />System pipeline located in the western levee of the Santa Ana River. Approximately 5,700 linear <br />feet of supply pipeline will be constructed to injection wells within Centennial Park. The supply <br />pipeline is proposed to be cement mortar coated and epoxy lined steel pipe, and will vary in size <br />from 36-inch, 16-inch, and 12-inch. The supply line will cross the Santa Ana River which will require <br />the pipeline to be constructed on the newly expanded Edinger Avenue Bridge. <br />Approximately 4,200 linear feet of 16-inch backflush pipeline will be constructed within Centennial <br />Road to convey well backflush discharge to the lake or the Greenville -Banning Channel. <br />A monitoring well is proposed down gradient of the Park's injection wells to monitor the impacts to <br />the groundwater basin. The monitoring well is proposed within the Heritage Museum of Orange <br />County. The area around the monitoring well will be improved and a new irrigation system for the <br />museum farm will be installed. <br />Two (2) Shared Facilities that will be occupied by Orange County Water District and the City of <br />Santa Ana. <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.