My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />Mathis Oso-Bypass, Moulton Niguel Water District, Laguna Niguel, C Project Manager. <br />Engineering design of the Flow Control/Pressure Reducing Station for the District. The existing <br />pressure reducing station was modified to include flow control capabilities. The piping arrangement <br />within the existing vault was modified, the size of valves was changed and the new flow <br />control/pressure reducing station was re -located within the street right-of-way in a left turn pocket. <br />r1t;;JJU1C FWUMAIltU. V01VU u aICCR VIUVV %.unl. acuity, IifIOUltull IVIIU.UCI VVcutr <br />District, Laguna Niguel, CA Project Manager. Design of an 18-inch pressure reducing valve and vault <br />which included approximately 50 linear feet of 18- and 24-inch pipeline. <br />Long Beach Valve Replacement, Long Beach Water Department, Lon!, ___,;h, CA. Project <br />Manager. Improvements to an existing Flow Control/Pressure Reducing Station for the Department. <br />The improvements included the removal of existing piping and control valves with the replacement of <br />new butterfly valves and plunger valves. The pressure reduction in this station was approximately <br />180 psi and required that the plunger valve be designed and sized properly to handle such large drop at <br />this station. <br />natelia Avenue vvater lvlain meplacement, Lily or Anaheim, %,A. Project Manager. Design of <br />3,000 feet of 16-inch water main on Katella Avenue from Disneyland Drive/West Street to Harbor <br />Boulevard and 4,000 feet of 12-inch water main on Katella Avenue from Harbor Boulevard to Haster <br />Street. <br />Fl ca,vu1,U UV, IVI%JUIL.,n Niguel Water DiSL..IL, L-auu,ia Niguvi, Project Manager. <br />Responsible for the Paseo Del Valle, Highlands, and Ivy Glen Pressure Upgrades for the District. Tasks <br />included additional distribution piping and addition of pressure reducing valves for over 400 customers. <br />Crown Point Pump Station Reclaimed Water Conversion, Moulton Nigut r District, Laguna <br />Niguel, CP Project Manager. Design of the conversion of the existing domestic water pump station to <br />a reclaimed water pump station which included new pumps, pressure reducing facility, piping and <br />appurtenances. <br />I-J, Wa4nr I inn Pnlnrratinnc rite of Anaheim rA Project Manager. Design of the relocation of <br />approximately 20,000 linear feet of 6- to 16-inch water lines as part of Caltrans 1-5 widening project. <br />Project also included the design of a pressure reducing station. <br />Preliminary tngineering Tor SOUth (:ounty I urnout, Moulton Niguel Water uistrlct, Lagun; <br />Niguel, C1 Project Manager. Preliminary engineering design for proposed Metropolitan Water District <br />turnout and flow control facility to connect to Moulton Niguel Water District's 850 Zone system and El <br />Toro Water District's system. The study included preliminary calculations used to size the valves and <br />piping, conceptual turnout and flow control facility site and mechanical layouts, pipeline alignment <br />analysis, estimated construction costs and construction schedule. <br />Dnnifir D�rl4 Cl^ui f`^n+r^l RA^.vl+^m Al;i vial \Ah+er flit+rir+ I Ali -..el PA Project <br />Manager. Design of the Bridlewood and Cabot Flow Control Facilities which allowed the District to use <br />the higher -pressure water from the Central Relief Project. <br />Big Niguel and Little Niauel Flow Control Facilities. Moulton Niauel Water District. Laauna <br />Niguel, Cf Project Manager. Design of the two flow control facilities which will allow the District to use <br />higher pressure water from the Central Relief Project in lieu of existing pump stations. <br />AbLfdl IVlfdlfdl Vault upgraurds, 1Y1u ague) Water ulstrlc'l Julia 111119. ut:1, � Project <br />Manager. Design of the upgrade of I.D. Nos. 1, 2, and 3 and the Camino Capistrano Flow Control and <br />Meter Vault facilities. <br />TETRA TECH T. Epperson - Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.