My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Approve Agreement for Learning Management System
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 24 - Approve Agreement for Learning Management System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:45:13 PM
Creation date
8/15/2023 1:45:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
24
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. All pricing for additional scopes of work is valid for ninety (90) calendar days from the date of <br />submission to the CLIENT. <br />3. Travel costs are not included in the Cost Estimate and will be invoiced per MERIDIAN'S current <br />travel guidelines. <br />F. Out of Scope <br />The following is currently deemed outside of the scope for this implementation: <br />• Migrations, integrations, modifications to the system that are not explicitly included in the scope of <br />this SOW. <br />• Custom reports, localization, documentation, or online help. <br />• Content cleansing, migration, or uploading unless specifically identified. <br />• Consulting or professional services not specified in the implementation tasks (i.e. courseware <br />development, courseware troubleshooting, SCORM, HW/SW configurations or internal network <br />setup or maintenance). <br />• Advanced Graphical design or other advanced (e.g. flash) GUI support. <br />• Editable training materials such as instructor and student guides. <br />G. Change Management <br />MERIDIAN recognizes that changes are a normal part of the project life cycle. Changes to the <br />scope or timeline of the Services contemplated by this Agreement will require a formal Change <br />Order Statement of Work ("Schedule 2") to be submitted by the MERIDIAN Project Manager to the <br />CLIENT. Changes in scope may include an increase in cost and/or timeline and will be specified <br />in each change request. Prior to beginning the change request, CLIENT must execute the <br />Schedule 2 Change Order. MERIDIAN requires formal change acceptance before beginning work <br />on any changes. Changes within the defined scope of the contract need approval by the CLIENT <br />Project Manager and the MERIDIAN Project Manager. Acceptance for scope changes, are given <br />when both the CLIENT Project Manager and the MERIDIAN Project Manager formally approve <br />the change by signing off on Schedule 2 so that miscommunications are avoided. Project change <br />procedure is as follows: <br />i. Identify change (can originate from the CLIENT Project Manager or the MERIDIAN Project <br />Manager); <br />ii. MERIDIAN completes Change Request Form; <br />iii. MERIDIAN Project Manager determines the impact of the proposed change (schedule, <br />resources, time, and/or cost); <br />iv. MERIDIAN Project Manager submits Schedule 2 to the CLIENT Project Manager for <br />review/approval. <br />V. MERIDIAN Project Manager receives approval from the CLIENT Project Manager within <br />three (3) business days; and <br />vi. MERIDIAN Project Manager modifies or, if necessary, re -baselines the Project Schedule <br />and Plan to include the approved change. <br />
The URL can be used to link to this page
Your browser does not support the video tag.