My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - Agreements for Water Interconnection Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 30 - Agreements for Water Interconnection Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:34:58 PM
Creation date
8/15/2023 1:47:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
30
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/pw <br />Item # 30 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />May 17, 2022 <br />TOPIC: Agreements for Water Interconnection Study <br />AGENDA TITLE <br />Approve an Appropriation Adjustment, Interagency Agreement with the Orange County <br />Water District and Moulton Niguel Water District to Evaluate a Potential Emergency <br />Interconnection, and Approve an Agreement with Stantec Consulting Services, Inc. in an <br />Amount Not to Exceed $200,000 for a Three-year Term to Conduct a Preliminary Design <br />Study and Environmental Analysis for an Emergency Water Distribution Interconnection <br />(Non -General Fund) <br />RECOMMENDED ACTION <br />1. Authorize the City Manager to execute an agreement with Orange County Water <br />District and Moulton Niguel Water District for a three-year term beginning on May 17, <br />2022 and ending on May 16, 2025 to conduct a preliminary design study and <br />environmental analysis for an emergency water distribution interconnection, subject <br />to non -substantive changes approved by the City Manager and City Attorney. <br />2. Approve an appropriation adjustment to recognize $200,000 in reimbursement <br />obligation funds from MNWD into the Water, Public Works Water Revenue, Expense <br />Reimbursement revenue account and appropriate the same amount into the Water, <br />Water Admin/Engineering, Contract Services — Professional expenditure account. <br />(Requires five affirmative votes) <br />3. Authorize the City Manager to execute an agreement with Stantec Consulting <br />Services, Inc., for a three-year term beginning on May 17, 2022, and ending on May <br />16, 2025, to evaluate a water interconnection with Moulton Niguel Water District, in an <br />amount not to exceed $200,000, subject to non -substantive changes approved by the <br />City Manager and City Attorney. <br />DISCUSSION <br />The City's Water Resources Division oversees and maintains the daily operations of the <br />City's water distribution system, which serves more than 45,000 customer connections. <br />The water system is composed of approximately 480 miles of water main, 21 groundwater <br />wells, seven pump stations, 10 reservoirs with a storage capacity of 49 million gallons, <br />
The URL can be used to link to this page
Your browser does not support the video tag.