My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 9:06:16 AM
Creation date
8/16/2023 8:19:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C - FIRM & TEAM EXPERIENCE <br />OFFICE LOCATIONS: AEI has over 20 offices located throughout the United States. Please visit our <br />website at www.aeiconsultants.com for a list of address locations. Work on this project will be <br />primarily completed from AEI's regional local offices and AEI's dedicated Capital Planning Consulting <br />Team. <br />AEI CONSULTANTS' CORE BUSINESS: AEI's core business and service lines include the preparation of <br />Facility Condition Assessments (FCAs) and Physical Needs Assessments. AEI also completes a <br />substantial amount of construction consulting and cost estimating services which is further discussed in <br />Section II of this Qualifications Package. AEI has been completing Facility Condition Assessments on <br />real estate assets for the past 15 years. To date, AEI has completed over 28,000 Facility Condition <br />Assessments throughout North America. Last year (2017), AEI prepared over 5,100 Facility Condition <br />Assessments. Other services which AEI Consultants provides include the preparation of Phase I <br />Environmental Site Assessments, Phase II Sub -Surface Investigations, Site Mitigation/Remediation <br />Services, Industrial Hygiene Consulting (ACM & LBP Surveys) as well as Building Science Consulting <br />which includes the preparation of Seismic Risk Analysis Reports, Energy Audits and Surveys for <br />compliance with the Americans with Disabilities Act (ADA), as well as forensic and intrusive surveys of <br />buildings. <br />STAFFING: In order to successfully complete this project, AEI will call upon its senior level engineers <br />and architects who have substantial experience in completing FCAs on municipal, educational and <br />university buildings. Matt Wasson will be acting as the Project Manager and providing the final level of <br />technical review on all aspects of the project. The table presented below represents the potential staff <br />for the various tasks of this assignment and responsibilities of the individuals working on the project. <br />Facility Condition Assessment Team <br />Team Member <br />Title & Position <br />Responsibilities <br />Matthew Wasson <br />Vice President - Capital <br />Matt will be acting as the Project Manager and managing <br />Planning <br />AEI's field inspection team. Matt will also be heavily <br />FCA Project Manager <br />involved with Quality Control and providing a global FCA <br />database for the entire campus. <br />Joe Sloboda <br />Vice President — Building <br />Field Inspection, mechanical & electrical systems <br />Assessments <br />evaluation & narrative report preparation, Cost Estimating <br />Roy Anderson, PE <br />Vice President — Seismic Risk <br />Field inspection, seismic risk analysis, narrative report <br />preparation <br />Jason Santiago <br />Project Manager <br />Field inspection, narrative report preparation, cost <br />estimating <br />Steven Peck <br />Project Manager <br />Field inspection, narrative report preparation, cost <br />estimating <br />Michael Novick, RA <br />Sr. Project Manager <br />Field inspection, narrative report preparation, cost <br />estimating <br />Mahmoud Nazemi <br />Project Manager <br />Field ins ection narrative report preparation <br />Resumes of AEI's project team are included in Section G of this Qualifications Package <br />4`'r. AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.