My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Item 21 - Comprehensive Facilities Condition Assessment for Various City Buildings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 9:06:16 AM
Creation date
8/16/2023 8:19:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C - FIRM & TEAM EXPERIENCE <br />Village of Oak Park Portfolio, Oak Park, IL <br />Client: <br />Village of Oak Park, Illinois <br />Contact: <br />Lisa Shelley - Village Manager — (708) 383-6400 — villagemanager@oak- <br />ark.us <br />Project Discussion: <br />AEI is preparing FCAs in accordance with ASTM E2018-15 on a <br />portfolio of 2 fire stations and 3 water pumping station buildings <br />comprising an area of 32,600 SF. AEI is capturing data in tablets and <br />utilizing KyKloud software in the preparation of the FCA reports and <br />global FCA database. Michael Novick, RA is performing field <br />inspections and preparing the FCA analysis and project management <br />and senior level technical review is being performed Matt Wasson. <br />Presentation: <br />AEI's project deliverables include narrative FCA reports, geo-coded <br />photos, equipment & condition inventories, ADA accessibility data and <br />cost estimates for future maintenance and replacements. Key <br />information to be included in the reports is each building's Facility <br />Condition Index (FCI), Expected and Remaining Useful Lives (EULs & <br />RULs) of equipment and building systems, and a 10-year capital <br />expenditure budget. <br />Date: <br />January 2020 <br />46 <br />TY Oak Park <br />f <br />� <br />rr. <br />1.jl` <br />IL <br />3 L <br />`AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.