Laserfiche WebLink
qrw% W <br />Gorperwee die <br />1AMERIOROEMOLMON,, INC. <br />2627 fNalolulu Avw we <br />M& M60 AM, <br />lft,7trose, CA 97424 <br />DENOUMN •ASA TENENr-EARTNWi"X <br />ZfeJV 603IOD • MSI Z40.00 P <br />9VWW-/17teri0rdem011 th%7 We <br />Asbestos/lead <br />Work Plan <br />1. 14 calendar days prior to beginning any work, a notification for asbestos <br />removal activities was sent to the Air Quality Management District along with all <br />applicable fees. <br />2. Interior Demolition, Inc. will post permits of all equipment on site per AQMD <br />regulations. <br />3. All abatement work areas have been demarcated using warning & danger <br />barrier tape & signs. The demarcated zone is a minimum of 20 feet from the <br />work area. Additionally, warming signs will be placed at all entry and exits to <br />help ensure public safety. <br />4. Interior Demolition, Inc. will utilize a three -stage decontamination unit which <br />will be installed adjacent to the work area. This unit will be equipped with <br />water & towels. Engineering controls such as negative air filtration machines, <br />decontamination chambers & a disposal area will be utilized. <br />5. In order to contain all work areas, 6 mil poly will be erected and any stationary <br />objects that are not being removed will also be covered. <br />6. Interior Demolition, Inc.'s abatement workers will utilize a NIOSH/MSHA <br />approved half face negative pressure respirators. These masks will be <br />equipped with a HEPA filter. Additionally, our workers are required to wear full <br />body coveralls, disposable gloves & safety glasses. <br />7. Interior Demolition, Inc.'s workers will utilize wet methods when removing any <br />ACM or Lead materials. <br />8. Interior Demolition, Inc. has chosen BDC Waste Management's hazardous <br />waste division to handle to the transportation of the waste to their approved <br />landfill. <br />9. Interior Demolition, Inc. will perform the OSHA required air sampling at a <br />minimum of 25% of the work crew on a daily basis. <br />10. IDI will stabilize any lead demarcated by the survey prior to demolition. <br />