My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Agreements for On -Call Demolition Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Item 22 - Agreements for On -Call Demolition Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 9:10:22 AM
Creation date
8/16/2023 8:20:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
5/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERIOR DEMOLITION, INC. City of Santa Ana <br />ASBESTOS ABATEMENT PLAN 1301 W 11th St <br />Santa Ana, CA 92703 <br />DANGER <br />ASBESTOS CONTAMINATION <br />Respirators and Protective Clothing <br />Must Be Worn by All Personnel Entering This Area <br />A Access to Work Area <br />Worker entry and exit into each contaminated area shall be controlled by use of <br />an entry/exit log. Inspectors and supervisors shall also sign the log as evidence <br />of entry into the area. <br />8. Abatement Guidelines <br />Abatement is to commence only after the site supervisor has determined that <br />the restricted area is established and clearly marked. The following removal <br />steps/phases have been presented as a logical sequence of events; the work <br />should follow this sequence: <br />C. Removal Steps - Asbestos <br />Adequate wetting. Using an airless sprayer capable of delivering a fine low <br />pressure mist, wet the ACM with amended water, fashion glove bag <br />containment <br />Removal of Asbestos Containing Materials (ACM). <br />a. Remove ACM in manageable section while the material is still wet. <br />b. Use HEPA filtered vacuums to collect all ACM debris and dust/dirt <br />containing ACM. <br />C. Promptly clean up and dispose of ACM waste in leak -proof containers. <br />Prohibited Activities During ACM Removal <br />Use of high speed abrasive disc saws, sanders, drills, or other power <br />tools that are not equipped with point -of -cut dust collection systems that <br />are attached to HEPA filtered vacuums. <br />• Use of compressed air to remove asbestos. <br />• Removal of ACM while it is dry or when it has not been adequately <br />wetted. <br />• Dry sweeping, shoveling, or other dry clean-up of ACM, or dust/dirt <br />containing ACM. <br />3. Removal of Tools and Equipment <br />a. Thoroughly HEPA vacuum and wet wipe tools and otherequipment <br />before removing from work area. <br />b. Any power tools that cannot be completely de -contaminated must be <br />placed in pre -labeled plastic bags and seated with duct tape before <br />removing from work area. <br />C. Hand toots such as scrapers, broad knives, etc., can be cleaned by wet <br />wiping and are to be bagged prior to removal from the work area. <br />Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.