Laserfiche WebLink
electrical gear, controls etc., will be separated prior to the demolition as much as <br />possible. All metal materials recycled as part of this project will be documented with <br />weight tickets which will be provided to City of Santa Ana. These materials will be <br />hauled to the following recycling facilities: <br />Ecology Recycling <br />Santa Fe Springs <br />3.5 CONCRETE AND ASPHALT RECYCLING <br />Clean concrete debris from the demolition activities will be stockpiled and then <br />shipped off for re -cycling. All concrete and asphalt that is hauled off the project site <br />will be recycled and tickets will be provided to City of Santa Ana. This type of <br />recycling does not get weighed but each end dump load we haul off is equivalent to <br />20 tons. The owner will be provided trucking tickets that show the number of loads. <br />As of this writing all concrete material will be shipped to <br />Arcadia Reclamation <br />1270 Arrow Hwy <br />Irwindale, CA <br />3.6 DEMOLITION DEBRIS DISPOSAL <br />All demolition debris that will not be recycled by IDI will be loaded into semi -end <br />dumps and hauled to a disposal facility for further recycling or landfill. The end dumps <br />will be covered priorto leaving the site. 80% by weight of the construction and <br />demolition debris be diverted from landfills by a combination of recycling and re -use. <br />This includes interior soft debris (i.e. drywall, plaster, ceiling tiles, roofing material, <br />etc.). Demolition debris will be hauled to the following disposal facilities: <br />Azusa Land Reclamation <br />1211 W Gladstone St <br />Azusa, CA <br />3.7 SWPPP <br />Interior Demolition, Inc. will maintain all SWPPP requirements. This includes but is not <br />limited to BMP's, shaker plates and straw waddles. <br />4.1 DUST CONTROL <br />IDI will control dust generation with physical barriers (such as perimeter fencing with <br />windscreen) and/or soil wetting. Excavation areas shall be secured and water will be <br />used to control any fugitive dust from blowing onto other properties. The Site will be <br />controlled and no excavation will be conducted in times of high wind conditions (e.g. <br />wind speed in excess of 25 miles per hour). Converse will conduct air monitoring at <br />Site perimeter and work areas. <br />