My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Agreements for On -Call Demolition Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Item 22 - Agreements for On -Call Demolition Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 9:10:22 AM
Creation date
8/16/2023 8:20:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
5/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor shall hand deliver a City provided work notice letter to adjacent resident owners at least <br />one week prior to the demolition work. <br />Asbestos Abatement: <br />The work described herein consists of removal and disposal of ALL asbestos containing materials <br />(ACM -friable or nonfriable) and subsequent cleaning of the sites in accordance with all applicable <br />federal, state and local regulations, standards and codes governing asbestos and any other trade work <br />done in conjunction with the abatement. Results of any testing that identify asbestos containing <br />materials will be provided by the City. It is the responsibility of the Contractor to determine if any <br />additional asbestos removal is required in addition to the surveys. <br />Copies of all notifications must be submitted to City including, abatement contractor's license, map <br />and/or clear documentation specifying asbestos containing materials abated; completed waste <br />manifests; and a completion letter indicating that all asbestos containing materials from these <br />properties have been abated and properties are ready to be demolished. <br />Lead Removal: <br />The Contractor shall take all necessary precautions and follow all Occupational Safety & Health <br />Administration (OSHA')s guidelines required in the handling of lead contained materials if any are <br />detected. Please refer to the Lead Hazard Evaluation Report which will be provided to the Contractor <br />prior to on -call bid. <br />Rat and/or Vermin abatement: <br />Contractor, prior to performing demolition, is responsible for providing rat and/or veimin abatement. <br />As part of the demolition completion package, written certification will be provided to the City, <br />stating that such work was performed, and that the structures were free of infestation prior to the <br />demolition taking place. <br />Erosion Control: <br />Contractor shall prepare erosion and sediment control plan immediately after award of the contract <br />for the approval of the Engineer. The plan shall be prepared per the applicable guidelines described <br />in the latest version of the Orange County Program Construction Runoff Guidance Manual <br />(http://ocwatersheds.com/documents/bmp/constructionactivities), The Contractor shall submit the <br />plans for review and shall make the necessary revisions to the plans as directed by the City. The <br />plans shall be prepared by a Civil Engineer licensed in the State of California. The City may waive <br />the requirement of licensed Civil Engineer if the Contractor can satisfactorily prove to the City that <br />the person preparing the erosion control plan is qualified in the field of erosion control. <br />The Contractor shall keep a copy of the erosion control plan on -site for the duration of the contract <br />and shall provide all necessary control devices to implement all necessary measures as shown on the <br />plan. The erosion control plan shall remain in effect until approval to remove is granted by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.