RFQ For On -Call Demolition Service
<br />MA6R6-Z-TECHN0L0GY
<br />Benefits of having Daniel Duarte your project:
<br />Relevant Experience
<br />$56.9-K Demolition of Facility at Peter Marshall Park in Anaheim, CA <<References Project #1
<br />This project included the demolition, removal of building, block walls, capping of sewer laterals,
<br />disconnecting and capping utility services and appurtenant improvements, as well as the removal and
<br />disposal of asbestos -containing building materials found in structures and improvements at the facility.
<br />The installation of temporary chain link fences and gate was also included.
<br />$14.4-K Demolition of 8,723-SF of Fire Damaged Homes <<References Project #2
<br />This project was initiated to "Make Safe Fire Damaged Homes" due to fires on October 9th, 2017.
<br />Residential buildings at 950, 954, and 970 Canyon Heights Drive in Anaheim, CA were uninhabitable and in
<br />danger of collapsing after being affected by one of the largest fires to hit Orange County, forcing several
<br />thousand people to evacuate Anaheim, Orange, and Tustin. MZT mobilized on site within hours of
<br />receiving the notification to begin demolition of three structures by utilizing excavators to push in the outer
<br />walls, or to pull walls inward in order to prevent additional damage to adjacent, less -damaged yellow -
<br />tagged properties. Prior to the disturbance, MZT temporarily braced walls that could fall in the wrong
<br />direction. Damaged stud walls were demolished from the top downward in a systematic manner with care
<br />not to buckle the wall. The roof, walls, and interior items were demolished inward toward the center of the
<br />foundation. Debris was consolidated on the slab as directed by the City of Anaheim.
<br />$125-K Demolition of 5,900-SF Residential Lot in Anaheim, CA
<br />This project consisted of demolition, removal of building, block walls, capping of sewer laterals, disconnect
<br />and cap utility services, installation and relocation of fences, and appurtenant improvements on the property
<br />at 1104 N. Homer Street, as well as the removal and disposal of asbestos -containing building materials
<br />found in structures and improvements at the property. In addition, the project included the removal and
<br />disposal of existing block walls, concrete footings, foundation, asphalt concrete and trees, installation of new
<br />chain link fences and gates, application of weed killer, and spreading of wood chips.
<br />$64.5-K Partial Demolition of 1,614-SF of LA Fitness 2nd Floor at Los Angeles, CA
<br />This project involved the 1,614-SF partial demolition of the second floor of LA Fitness. We removed wood -
<br />framed partition walls as well as system components for electrical, mechanical, and structural systems.
<br />$799-K Demolition and Relocation of Utilities at Los Angeles, California
<br />This project involved the demolition, removal, and relocation of existing utilities such as electrical lines,
<br />condenser units, and appurtenances.
<br />$2.2-M Demolition and Repair of Pier 5 Waste Water Main at Naval Base San Diego, CA
<br />This project includes replacing the existing deteriorated sewer discharge forced main line at Pier 5 in Naval
<br />Base San Diego with a new HDPE main line system. Deteriorating pipes and incidental elements (pump
<br />suction pipes, coupling, wye connection, etc.) will be demolished at various points along the pipeline. Site
<br />preparation includes site clearing, excavation, fencing, and preparation for construction. Paving and site
<br />improvements include utility backfill and compaction, pavement resurfacing, and asphalt pressure testing.
<br />Debris generated by repair work will be hauled off -base and all fencing will be removed.