Laserfiche WebLink
0RFQ For On -Call Demolition Service == <br />MACRO-Z-TECHNOLOGY <br />Other similar complexities include the abatement and removal of asbestos- and lead -containing materials, <br />as well as temporary fencing and signage to prevent members of the public from accessing the project site <br />during demolition services. <br />-..-.-......... <br />_..............................._.................._........................._.__........_._........... <br />Client: City of Anaheim Public Works Consultant Project Manager: Daniel Duarte <<Same as <br />ProDosed PM <br />Reference Point of Contact: Jose Jimenez, Associate Project Planner <br />Reference Phone: (714) 765-4901 Reference Email: ; jjimaenez@anaheim.net <br />Project #2. $14.4-K Immediate Response Demolition of 8,723-SF of Fire Damaged Homes <br />Location: Anaheim, CA Year Comp leted: <br />2017 <<within last 5 ears <br />............................................... _........................................................................... <br />Project Description <br />This immediate -response project was initiated to "Make Safe Fire <br />Damaged Homes" due to fires on October 9th, 2017. Residential buildings <br />Relevant Scope items: <br />at 950, 954, and 970 Canyon Heights Drive in Anaheim, CA were <br />demolition, HAZMAT <br />uninhabitable and in danger of collapsing after being affected by one of the <br />removal, grading for <br />largest fires to hit Orange County, forcing several thousand people to <br />drainage, importing & <br />evacuate Anaheim, Orange, and Tustin. <br />exporting fill, cap of water & <br />Prior to the demolition of the three structures, MZT's Superintendent <br />sewer lines, compacting <br />Demolition of: foundations, <br />coordinated with Anaheim representatives to prepare the site for <br />footings, slabs, attached <br />mobilization and demolition activities. MZT also coordinated alongside city <br />garage, landscaping, <br />officials, Anaheim Fire Department, and the city utility department to shut <br />fencing, walls, trees <br />off utilities such as gas and electricity to safely demolish red -tagged homes. <br />' Completed within 5 years <br />After performing a visual inspection of the structures and surrounding work <br />Performed as Prime <br />area to avoid hazardous materials and other hazards, a work zone was <br />Contractor <br />established for demolition and debris processing. <br />Public Agency <br />MZT then mobilized on site within hours of receiving the notification to On Call Rapid Response <br />begin demolition of the 8,723-SF structures by utilizing excavators to push Contract <br />in the outer walls, or to pull walls inward in order to prevent additional <br />damage to adjacent, less -damaged yellow -tagged properties. Prior to the disturbance, MZT temporarily <br />braced walls that could fall in the wrong direction. Damaged stud walls were demolished from the top <br />downward in a systematic manner with care not to buckle the wall. The roof, walls, and interior items were <br />demolished inward toward the center of the foundation. Debris was consolidated on the slab as directed by <br />the City of Anaheim. <br />During demolition, MZT utilized a water truck and water hose to direct a localized water spray to the source <br />of demolition activities, thereby reducing airborne dust particles. The water supply was only used as needed <br />to minimize run-off. MZT cleaned up the access to the work area of all debris generated from demolition <br />activities and turned the site back to the City. <br />This project was awarded under the Demolition, Disposal/Debris Removal, Erosion & Sediment Control & <br />Immediate Response Master Agreement with the City. <br />Similar Size, Scope, and Complexity <br />Similar Size. At 8,723-SF of demolition and $14.4-K, this is similar in size to the structures to be demolished <br />under the City's On -Call Demolition Services contract. <br />Similar Scope. This project included: demolition of building structure and exterior site features, HAZMAT <br />removal, site grading for drainage, and response within a local region. <br />Similar Complexity. This rapid -response project is similar to On -Call services contracts in that we must be <br />ready to hit the ground running at the Notice to Proceed, which could come at any time, and mobilize as <br />quickly as possible. MZT is always prepared to tackle complex and time -sensitive work, and will be ready to <br />take on whatever demolition project is needed by the City of Santa Ana. <br />