0RFQ For On -Call Demolition Service ==
<br />MACRO-Z-TECHNOLOGY
<br />Other similar complexities include the abatement and removal of asbestos- and lead -containing materials,
<br />as well as temporary fencing and signage to prevent members of the public from accessing the project site
<br />during demolition services.
<br />-..-.-.........
<br />_..............................._.................._........................._.__........_._...........
<br />Client: City of Anaheim Public Works Consultant Project Manager: Daniel Duarte <<Same as
<br />ProDosed PM
<br />Reference Point of Contact: Jose Jimenez, Associate Project Planner
<br />Reference Phone: (714) 765-4901 Reference Email: ; jjimaenez@anaheim.net
<br />Project #2. $14.4-K Immediate Response Demolition of 8,723-SF of Fire Damaged Homes
<br />Location: Anaheim, CA Year Comp leted:
<br />2017 <<within last 5 ears
<br />............................................... _...........................................................................
<br />Project Description
<br />This immediate -response project was initiated to "Make Safe Fire
<br />Damaged Homes" due to fires on October 9th, 2017. Residential buildings
<br />Relevant Scope items:
<br />at 950, 954, and 970 Canyon Heights Drive in Anaheim, CA were
<br />demolition, HAZMAT
<br />uninhabitable and in danger of collapsing after being affected by one of the
<br />removal, grading for
<br />largest fires to hit Orange County, forcing several thousand people to
<br />drainage, importing &
<br />evacuate Anaheim, Orange, and Tustin.
<br />exporting fill, cap of water &
<br />Prior to the demolition of the three structures, MZT's Superintendent
<br />sewer lines, compacting
<br />Demolition of: foundations,
<br />coordinated with Anaheim representatives to prepare the site for
<br />footings, slabs, attached
<br />mobilization and demolition activities. MZT also coordinated alongside city
<br />garage, landscaping,
<br />officials, Anaheim Fire Department, and the city utility department to shut
<br />fencing, walls, trees
<br />off utilities such as gas and electricity to safely demolish red -tagged homes.
<br />' Completed within 5 years
<br />After performing a visual inspection of the structures and surrounding work
<br />Performed as Prime
<br />area to avoid hazardous materials and other hazards, a work zone was
<br />Contractor
<br />established for demolition and debris processing.
<br />Public Agency
<br />MZT then mobilized on site within hours of receiving the notification to On Call Rapid Response
<br />begin demolition of the 8,723-SF structures by utilizing excavators to push Contract
<br />in the outer walls, or to pull walls inward in order to prevent additional
<br />damage to adjacent, less -damaged yellow -tagged properties. Prior to the disturbance, MZT temporarily
<br />braced walls that could fall in the wrong direction. Damaged stud walls were demolished from the top
<br />downward in a systematic manner with care not to buckle the wall. The roof, walls, and interior items were
<br />demolished inward toward the center of the foundation. Debris was consolidated on the slab as directed by
<br />the City of Anaheim.
<br />During demolition, MZT utilized a water truck and water hose to direct a localized water spray to the source
<br />of demolition activities, thereby reducing airborne dust particles. The water supply was only used as needed
<br />to minimize run-off. MZT cleaned up the access to the work area of all debris generated from demolition
<br />activities and turned the site back to the City.
<br />This project was awarded under the Demolition, Disposal/Debris Removal, Erosion & Sediment Control &
<br />Immediate Response Master Agreement with the City.
<br />Similar Size, Scope, and Complexity
<br />Similar Size. At 8,723-SF of demolition and $14.4-K, this is similar in size to the structures to be demolished
<br />under the City's On -Call Demolition Services contract.
<br />Similar Scope. This project included: demolition of building structure and exterior site features, HAZMAT
<br />removal, site grading for drainage, and response within a local region.
<br />Similar Complexity. This rapid -response project is similar to On -Call services contracts in that we must be
<br />ready to hit the ground running at the Notice to Proceed, which could come at any time, and mobilize as
<br />quickly as possible. MZT is always prepared to tackle complex and time -sensitive work, and will be ready to
<br />take on whatever demolition project is needed by the City of Santa Ana.